V

Vedanti Bhonde

Software Engineer

Nagpur, Maharashtra, India0 mo experience

Key Highlights

  • Expert in Battery Thermal Management and HVAC Engineering.
  • Proven track record in optimizing steam and manpower efficiency.
  • Skilled in product design with hands-on experience in CAD tools.
Stackforce AI infers this person is a specialist in HVAC and Energy Management within the Electric Vehicle sector.

Contact

Skills

Core Skills

Hvac EngineeringTotal Productive Maintenance (tpm)Data AnalysisProject ManagementThermodynamicsProduct DesignManufacturing

Other Skills

AutoCADAutodesk Fusion 360Automotive DesignAutomotive EngineeringBTMSBattery Management SystemsCollaborative Problem SolvingCommunicationElectric VehiclesEnergy StorageEnglishEvent ManagementEvent PlanningHeat TransferLeadership

Experience

Emami ltd

2 roles

Senior Executive Engineer

Aug 2023Present · 2 yrs 7 mos · Silvassa, Daman and Diu, India · On-site

Total Productive Maintenance (TPM)HVAC EngineeringPeople Managementoperations

Industrial Trainee

Jan 2023Jul 2023 · 6 mos · Silvassa, Daman and Diu, India · On-site

  • Worked for 6 months as Industrial Trainee at Emami Ltd. Masat unit (Jan 2023- July 2023)
  • and worked on 2 projects (1st completed, 2nd ongoing). Following are the projects and the
  • work done
  • Steam consumption optimisation- the aim was to calculate the amount of steam wasted, to
  • find the reasons for the wastage, calculate the major losses and the cost of fuel which is
  • wasted to produce the unused steam and eliminate the losses by taking required actions. The
  • tasks includes:
  • ● Recording daily Steam production from boiler and calculation of steam consumed by
  • machines using collected data of a month.
  • ● Calculating wasted/unused steam, detecting losses and their causes, and evaluating
  • data to find daily steam consumption patterns for each machine.
  • ● Root Cause Analysis of losses, finding areas for improvement and recommending
  • methods to reduce losses.
  • Manpower optimisation-the goal is to improve total productivity by implementing kaizen
  • practices such as reducing manpower, costs associated, bottlenecks and incorporating
  • mechanisation or automation. The task includes:
  • ● Identification of manual and automatic activities in packing lines.
  • ● Time motion analysis of packing lines, identification of Value Added and Non Value
  • Added activities and observing the manpower.
  • ● Identifying bottlenecks and potential locations for automation/mechanisation.
  • ● Creating designs for automating the existing process within the limits that exist.
Data AnalysisSteam Boilerssteam consuming machinesms excelHeat TransferThermodynamics+1

Nikhil furnitures

Summer Internship

Jun 2022Jul 2022 · 1 mo · Nagpur, Maharashtra, India · On-site

  • Designed a sheet metal foldable shoe rack using AutoCAD and Solidworks.
  • Design was made considering machinery already available in the factory and manufacturing constraints.
  • Design was aimed to minimize material usage and reduced welding operations to eliminate warpage and to reduce assembly time taken by the workers.
  • Manufactured using 0.7mm sheet metal, the process involved Sheet Metal Forming, Cutting and Bending as major operations. Also the deign was accepted and brought into production.
AutoCADSOLIDWORKSProduct DesignProduct DevelopmentManufacturingManufacturing Processes

Education

Visvesvaraya National Institute of Technology

M.tech — ELECTRIC VEHICLE TECHNOLOGY

Sep 2023May 2025

Shri Ramdeobaba Kamla Nehru Engineering College, Katol Road

undergraduate — Mechanical Engineering

May 2019May 2023

Stackforce found 100+ more professionals with Hvac Engineering & Total Productive Maintenance (tpm)

Explore similar profiles based on matching skills and experience