Vidhyesh Kamat

Director of Engineering

Northville, Michigan, United States19 yrs 4 mos experience
Highly Stable

Key Highlights

  • Over 17 years of experience in automation and manufacturing.
  • Expert in Lean Manufacturing and Six Sigma methodologies.
  • Proven track record in leading large-scale engineering teams.
Stackforce AI infers this person is a leader in automation and manufacturing transformation across diverse industries.

Contact

Skills

Core Skills

Product ManagementProject Management

Other Skills

Business Case PreparationChange ManagementCustomer RequirementsProject PlansTechnical LeadershipData AnalysisGo-to-Market StrategyPartner Relationship ManagementProduct Road MappingProduct StrategyManagementCommunicationLeadershipCross-functional Team LeadershipSales Meetings

About

I lead large‑scale automation, robotics, and manufacturing transformation programs that improve throughput, quality, and cost across complex global operations. Over 17+ years, I’ve built and scaled high‑performing engineering and operations teams, deployed next‑generation automation platforms, and driven supplier capability uplift across automotive, e‑commerce, and advanced manufacturing environments. My approach blends deep technical expertise with disciplined operational strategy—Lean Manufacturing, World Class Manufacturing, Six Sigma, and rigorous capital and program governance. I specialize in turning ambiguity into structured, scalable systems: plant‑wide footprint optimization, material flow design, warehouse and logistics optimization, line balancing, FMEA, and discrete‑event simulation to validate and de‑risk decisions. I’m passionate about developing teams, elevating supplier automation maturity, and building roadmaps that align engineering, operations, supply chain, and commercial stakeholders around measurable outcomes. Whether forecasting demand, designing factory flow, or deploying automation at scale, I focus on reliability, safety, and long‑term enterprise value. Core Expertise: Strategic Planning & Forecasting • Supplier Automation Maturity • Lean Manufacturing • World Class Manufacturing • Six Sigma • Continuous Improvement • Material Flow & Storage Analysis • Factory Simulation (Witness) • Discrete Event Simulation • Time & Motion Studies • Capacity Planning • Logistics Optimization • Program & Project Management • Automation Strategy • Industrial Engineering • Operations Management • FMEA • Automotive & Retail Systems

Experience

19 yrs 4 mos
Total Experience
4 yrs 9 mos
Average Tenure
1 mo
Current Experience

General motors

Director Automation

Apr 2026Present · 1 mo

Amazon

5 roles

Head of North America Sustainable Packaging NPI Deployment & Ramp

Nov 2023Apr 2026 · 2 yrs 5 mos

Business Case PreparationChange ManagementProduct ManagementCustomer RequirementsProject PlansTechnical Leadership+10

Sr Manager, Global Robotics & Automation Deployment

Promoted

Oct 2022Oct 2023 · 1 yr

Business Case PreparationChange ManagementProduct ManagementCustomer RequirementsProject PlansTechnical Leadership+10

Manager, Robotics Deployment Engineering

Oct 2019Oct 2022 · 3 yrs

Business Case PreparationChange ManagementProduct ManagementCustomer RequirementsProject PlansTechnical Leadership+10

Engineering Group Manager - NA Pick & Place Amazon Robotics

Nov 2017Oct 2019 · 1 yr 11 mos

Business Case PreparationChange ManagementProduct ManagementCustomer RequirementsProject PlansTechnical Leadership+9

Sr Program Manager - NA Tech Deployment & Systems Integrations

Apr 2016Nov 2017 · 1 yr 7 mos

Business Case PreparationChange ManagementSales MeetingsProduct ManagementCustomer RequirementsProject Plans+10

Johnson controls

2 roles

Industrial Engineering Manager - Metals & Mechanisms

Promoted

Oct 2012Apr 2016 · 3 yrs 6 mos

  • Lead / Manage Industrial Engineering Dept
  • Develop Capacity Planning / Footprint Utilization internal standards.
  • Capacity Planning / Demand Forecasting for all North America Metals Plant.
  • Short - Mid Term Strategy Planning
  • Plant Footprint / Material Flow Optimization across North America Metals Region.
  • Lean Manufacturing / JCMS / Continous Improvement
  • Train / Coach / Manage Manufacturing - Industrial Engineers in Capacity Planning / Footprint Optimization / Lean Manufacturing
Change ManagementProduct ManagementCustomer RequirementsProject PlansPartner Relationship ManagementProduct Road Mapping+6

Senior Industrial Engineer

Oct 2011Sep 2012 · 11 mos

Change ManagementProduct ManagementCustomer RequirementsProject PlansPartner Relationship ManagementProduct Road Mapping+6

Geometricplm

Sr.Industrial Engineer

Jun 2010Sep 2011 · 1 yr 3 mos

  • Chrysler - Warren Truck Assembly / Windsor Assembly
  • Product launch ,Material Flow Optimization, World Class Manufacturing (WCM-Fiat /Chrysler)
  • Manage offshore Simulation Team : Tasked to develop Manufacturing simulations for multiple clients in North America
Change ManagementProduct ManagementCustomer RequirementsPartner Relationship ManagementProduct Road MappingProduct Strategy+5

General motors - contract aerotek

Industrial Engineer

Apr 2010May 2010 · 1 mo

  • Responsible for IE activities in the plant
  • Coordinate activities between skilled worker/trades, maintenance crew, controls engineer & senior management.
  • Balance assembly line.
  • Time studies to develop cycle times.
  • Update Global Manufacturing System (GMS), write operator work instructions
  • Reduce non-value added activities through continuous improvement, 5S, Workplace Organization.
Sales MeetingsPartner Relationship ManagementCommunicationCross-functional Team Leadership

Geometricplm

Industrial Engineer

May 2007Apr 2009 · 1 yr 11 mos

  • Chrysler
  • Worked on launch of Greenfield Axle Manufacturing plant to develop plan for every part.
  • Responsible for Material handling strategies, Analysis &equipment
  • Benchmark existing facilities to implement best practices for material handling & delivery.
  • Supplier selection for Line side display equipment.
  • CAD drawings for existing material storage layout and work place organization.
  • Whirlpool
  • Successful launch of multiple warehouses in USA & Canada.
  • Develop a strategy for each SKU including identifying the dock,storage type, and quantity and
  • handling method.
  • 85% storage utilization was achieved by use of in-house built slotting software.
  • Caterpillar
  • Develop the flow & reduce the non value added work for the Caterpillar – Aurora 992 assembly line.
  • Fanuc
  • Discrete Event Analysis (Witness)
  • Visteon
  • Developed a plan for every part for WK/WD IP module,Identified the point of use, min / max levels at
  • storage, dock & deliver method. Designed the layout of the facility.
  • The proposal put a 200K Sq ft plant into a 150K Sq ft plant with innovative solutions.
  • Cummins
  • Six Sigma project to improve % utilization of the engine testing facility & avoid outsourcing testing.
  • Developed a Forecasting model to determine future production requirements at CMEP.
  • The Model was accurate within +/- 10%
  • Simulate the proposed Emission Solution line to validate & optimize the throughput of the line.
Sales MeetingsPartner Relationship ManagementCross-functional Team Leadership

Iet, inc.

Industrial Engineer

Aug 2005May 2007 · 1 yr 9 mos

  • Therma Tru – Butler, IN
  • Continuous time study and work measurement conducted on the assembly line
  • Developed the assembly hierarchy, work instructions and line balancing.
  • Provided alternative scenarios to improve the throughput of assembly line by 30%.
  • GM Powertrain – Livonia, MI
  • Responsible for IE activities in Engineering Assembly Dept.
  • Coordinate activities between skilled worker/trades, maintenance crew, controls engineer & senior management.
  • Balance assembly line, develop & maintain pillar charts.
  • Time studies to develop cycle times.
  • Update Global Manufacturing System (GMS), write operator work instructions.
  • Reduce non-value added activities through continuous improvement, 5S, Workplace Organization.
  • Productivity was maintained with 21% less line operators.
  • BWAY Corporation – Chicago, IL, York, PA, Homerville, GA
  • Conducted delay/downtime studies to evaluate the performance of assembly lines.
  • Worked intensively with operators and mechanics to evaluate root causes.
  • Recommended measures to improve line throughput performance by 30%
  • Conducted work sampling studies to evaluate utilization of indirect labor.
  • Recommended measures led to 20% reduction in indirect labor.
  • Layout study was conducted to optimize the existing layout (AutoCAD /Storage Analysis).
Sales MeetingsPartner Relationship ManagementCross-functional Team Leadership

Education

Vishwakarma Institute Of Technology

BE — Industrial Engineering

Wayne State University

MS — Industrial Engineering

Stackforce found 100+ more professionals with Product Management & Project Management

Explore similar profiles based on matching skills and experience