R

Rohit Kaushal

Operations Associate

Noida, Uttar Pradesh, India9 yrs 3 mos experience
Most Likely To Switch

Key Highlights

  • Over four years of experience in Manufacturing Engineering.
  • Expert in Six Sigma methodologies for process excellence.
  • Strong analytical skills with advanced proficiency in Microsoft Excel.
Stackforce AI infers this person is a Mechatronics Engineer with expertise in Manufacturing Engineering and Process Improvement.

Contact

Skills

Core Skills

Project ManagementBusiness AnalysisProcess ImprovementManufacturing Engineering

Other Skills

5SAutoCADAutomationBudgetingBusiness Process ImprovementBusiness StrategyCustomer Relationship Management (CRM)Design ThinkingDesign for Six Sigma (DFSS)Failure Mode and Effects Analysis (FMEA)Industry 4.0Internet of Things (IoT)KaizenLeadershipLean Manufacturing

About

Patience in capturing the perfect moment reflects my professional approach. As a Mechatronics Engineer with over four years in Manufacturing Engineering Assembly, I excel in New Model Development, Product Development, Data Analysis, and Visualization, leading new technology initiatives. My technical foundation was built at Thapar University, Patiala, complemented by an Executive MBA from IIM Raipur, enhancing my strategic planning and managerial skills. My expertise spans process excellence, with a deep proficiency in Six Sigma methodologies to streamline operations and improve quality. Additionally, I have developed skills in business growth strategies, identifying and leveraging opportunities to drive market expansion and increase profitability. With advanced analytical skills, particularly in Microsoft Excel, I excel at transforming data into actionable insights for strategic decision-making. Passionate about continuous improvement and innovation, I am committed to leveraging my diverse skillset to contribute to organizational growth and excellence. I actively seek collaborative opportunities that challenge the status quo and drive industry success.

Experience

Housing.com

2 roles

Senior Manager - Center of Excellence

Promoted

Jul 2025Present · 8 mos · Gurugram, Haryana, India · Hybrid

Manager - Center of Excellence

Feb 2024Jun 2025 · 1 yr 4 mos · Gurugram, Haryana, India · Hybrid

Caastle

Senior Project Manager

Sep 2022Jan 2024 · 1 yr 4 mos · New Delhi, Delhi, India · Hybrid

Project PlanningWrikeProject Management

Jubilant ingrevia limited

Executive Assistant to Chief Executive Officer

Apr 2022Sep 2022 · 5 mos · Noida, Uttar Pradesh, India

Business AnalysisSpreadsheetsProblem SolvingStakeholder ManagementTeam LeadershipTeam Management+10

Ola

Assistant Manager (Process Excellence & Compliance)

Aug 2021Apr 2022 · 8 mos · Bengaluru, Karnataka, India

  • Develop New Processes for Business Functions for International Geographies
  • (UK, Aus) - Rolled 15 new SOPs governing the Business structure in 6months, developed simplified driver onboarding process by collecting 40% documents through portals resulting in increase of Drive satisfaction score from 2.9 to 3.8 out of 5.
  • To prepare process improvement strategy report for upper management as part of Quality Enhancement - Conducted 5 Process audit to identify current compliance level, and Prioritized Improvement initiatives based on Risk Priority Number.
  • Improve Complaints handling and Reporting Mechanism for Customer & Driver - Measured and Analyzed big data, identified gaps by understanding on ground process w.r.t. SOP, Improvised product and processes and additional control measures, resulting in achieving 4 Sigma level (99.38%), Achieved Saving of $20,000 for implementing Auto Solve feature for ride feedback tickets as a cost-saving Initiative.
  • Define metrics governing the compliances and processes across UK - Monitored compliance metrics on driver documents on daily basis and improved processes, achieving reduction of ~5% noncompliance, catering to CIOs Scorecard metric.
  • To Drive program objectives with Geo Heads by defining business requirements w.r.t. regulatory compliance requirements, translate into project plan - Mitigated 2 Project by developing products for driver app & facilitated processes for cross functional team.
Business AnalysisCustomer Relationship Management (CRM)SpreadsheetsProblem SolvingStakeholder ManagementTeam Leadership+17

India yamaha motor pvt. ltd.

3 roles

Senior Manufacturing Engineer

Promoted

Jan 2019Aug 2021 · 2 yrs 7 mos

  • Studied Implementation of model Fz25 & R15 on parallel line For BD to optimize Shift load and maximize R15 production in 1 Shift on SIngle Line
  • Currently studying to Implement TVP & Offloading Ideas for 1 Line 1 Pitch time thinking way load balancing Main Line - Sub Assy - Feeding shop - BOP
  • Visualizing 2020 vs 2019 model Cost based on Hourly rate & Regular monitoring of 2020 cost and inputting feedback to system for any Gaps
  • Continuing the Zenshu Ryouhin 7 Steps for Development as per Model development schedule, Also Strengthen the ZR Steps 1,2 & 3 with YMC/YMRI to eliminate the Mfg. issue in component design & Strengthen the QA Map / QA Net with QE to impart learning with in the IYM & continual review to update the ZR activities based on CFT Feedback along with Change point Study & review the in built process controls & fix the action plan to eliminate any Quality issues thru Process design.
  • Developed Iron Horse(Dummy Precision Frame JIG) in IYM for Plastic & Electrical parts for Cover Gap Matching activity.
  • Implementation of overall 7 Poka Yoke system in assembly including torque assurance, CCC-2 Seal pressing and nut Runner 100% compliance Also Identified Key Areas for automation further implementation in 2021.
  • and Eliminate human error possibilities through technology/Gemba innovations.
  • Continuously study & update DFM’S as per Management & QMS System requirements
Business AnalysisCustomer Relationship Management (CRM)SpreadsheetsProblem SolvingLine BalanceTeam Leadership+23

Manufacturing Engineer

Mar 2018Dec 2018 · 9 mos

  • Body & Engine Conveyor Reduction from 3 to 2 resulting in space saving of 27% and space creation for Export Shop
  • Body Line Ext by 13m (6 station Addition) along with Body Sub Assembly Relay out & Synchronised with 2 assy Lines, Addition of Sub conveyor in Engine Line for Crank Case Zone & Engine Sub assembly synchronised with Engine Line resulting in 10% Productivity Increase and Inventory Reduction by 33%
  • Major New Models Development:
  • FZ15 & MT15
  • ABS Addition in R15 & Fz25
  • UBS Addition in Scooter Series
  • TOTAL MODELS- 45 INCLUDING VARIENTS
  • Drawing study and Quality requirement Fixing by QA MAP/Net making with Kakotora Input
  • Developed New JIG <78> for New Models
  • Zero Defect Process Making with QA NET Input, Colored Routing standards And Operation Stds completion of all activities done 1 wk before and achieving ASPR - 98%
  • ABS M/C Installation on both Assembly lines , Conducted ABS Trial & Program making with Shop and Quality divisions
  • Revision Control Management: All Revision Notice Released By R&D Updated In Process Standard & Recorded In system (Total Revision-3278, Process Updated-80, PP Drawing Revised-67)
SpreadsheetsProblem SolvingLine BalanceTeam LeadershipOperational ExcellenceAutomation+19

Graduate Engineering Trainee

Mar 2017Feb 2018 · 11 mos

  • Hands on Experience on R15 Engine: Comprehended How to Make Zero Defect Process and Enhanced Practical and Theoretical knowledge.
  • Drawings Study: Made all QA MAP and QA NET for R15, along with Tools Selection According to Requirement.
  • Part Drawing Study for JIGs: Studied JIG Design Concept & Designed JIGS for R15 & Conducted all JIG trials up to Handover.
  • M/C Study: Analyzed working principle, function & parameter settings, Study And Installed New M/C (VVA Inspection Device),Carried out Trials up to establishment of R15 V3.
  • SLIM Layout Implementation (Body Assembly Shop):
  • Space Saving- (1470 sq m — 1207 sq m) Saving- 263 sq m (18%)
  • 4M established after line commonisation: (Engine)
  • Man- Training Provided
  • Material- Layout Fixed,
  • M/C- Commonisation (Marking Fixture, Crank Pulling & Bond M/C)
  • Method- Same process Establishment.
  • Innovation: FZ25 Gear Balancer Automisation Concept- Using Photo Sensor.
  • Process Revision Management: Revision Notice study, Process change & Implementation based on Revision Notice Study
SpreadsheetsProblem SolvingLine BalanceOperational ExcellenceAutomationIndustry 4.0+13

Sharda motor industries ltd

Management Trainee

Nov 2016Feb 2017 · 3 mos · New Delhi Area, India

  • Handled PAN India Logistics- 14 Plants.
  • Also a Core team member in Purchase Planning and Strategy.
  • Logistics and Supply Chain Management:
  • Analyzed total annual spend of logistics, Target- 25% Spend Reduction.
  • Vendor Consolidation done on the basis of Major Contributors, Finalizing Rates on Zero Based
  • Costing and Delivery Terms.
  • Synchronized Pick-Up time with production time to obtain minimum inventory resulting in better
  • Cash Flow and JIT Deliveries.
  • Standardized Packing Material for better quality at customer end.
  • Routes optimized for short distance for better lead time and inventory control.
  • Implemented milk run process in West, resulting better material flow.
  • Raising RFQs for One-Time deliveries at various plants, Finalizing Vendor on the nature of product-
  • PTL or FTL.
  • Purchase Planning and Strategy:
  • Introduced SAP-ARIBA- Cloud procurement Services for better procurement.Targeting- 15% spend
  • reduction from Indirect Purchase for FY17-18.
  • Strategized Companies On-Going projects.
SpreadsheetsIndustry 4.0Microsoft ExcelFailure Mode and Effects Analysis (FMEA)Microsoft Office

Barclays corporate banking

Summer Intern

Jun 2015Jul 2015 · 1 mo · Noida Area, India

  • Worked at Middle Office- Corporate Banking. Learned finance from the grass root level- Analyzing profit loss accounts, balance sheets and cash flow statements, various funds including Hedge funds.
  • Understood work process involving- Requesting annual review report, analyzing the financials of a company, forecasting projections, Monitoring and Control of the accounts of the company.
  • Got familiar with Barclays Online Portals. Also wrote Zeus paper stating the current and future financial aspects for Barclay’s customer.
  • Performed covenant and trigger testing for Barclay’s customer, and flagging breach against thresholds.
  • Understood the customer needs by communicating with the on-site director.(U.K.)
Microsoft ExcelMicrosoft Office

India yamaha motor pvt. ltd.

Project Trainee

Jan 2015May 2015 · 4 mos

  • Analyzed and Improved the Inbound and Outbound Logistics- Supply Chain Management.
  • Analyzed Logistic Framework by- Visiting vendors, Different Logistics companies. Gathered Vendor Vise and type of transportation Information.
  • Set-up new packing standards for vendors to improve Handling.
  • With PYMAC education and Pick-up and Drop-Off Schedules were shared to supplier and transporter to create JIT deliveries and Inventory Control.
  • Route optimization reduced input logistic cost also creating transparency in material flow from Vendor to IYM.
  • Analyzed and Improved transport detention time.
  • A core team member in Purchase deptt.
  • Impact-
  • Implemented Milk Run at various vendors ends resulting in reducing of Cost of the transportation and freight.
  • With implementation of new packing standards wear and tear of material was significantly reduced and stacking of material bins was standardized.
  • PYMAC Card (Pan Yamaha Manufacturing and Control) education at vendor and transporter end resulted in inventory control which channelized proper cash flow at IYM.
  • Route optimization reduced Input Logistic Cost also generating Lead time evaluation and transparency in material flow from Vendor to IYM.
  • Advance Pick-up Schedules sharing with transporter eliminated non value added activities and increased JIT Deliveries.
  • Plant Layout was shared with transporter to analyze quick unloading pattern and reducing In-bound logistics time.
  • With implementation of all these process there was a significant impact on reducing the Cost of material.
Microsoft ExcelMicrosoft Office

Thapar university

Summer Internship

Jun 2014Jul 2014 · 1 mo · Patiala Area, India

  • Studied the programming of Micro-Controllers also designing and manufacturing of PCB’s.
  • Worked on an Automatic sensing 4-legged spider with Arduino as a hardware designer in Summer Project.

Jcb

Winter Intern

Dec 2013Jan 2014 · 1 mo · Ballabgarh

  • Studied in detail assembly of engine and vehicles- Excavators, Liftall, Loaders etc.
  • Worked on the analysis of Main frame working defects

India yamaha motor pvt. ltd.

Summer Intern

Jun 2013Jul 2013 · 1 mo · Greater Noida

  • Studied various manufacturing processes by visiting motorcycle vendors such as MINDA, Varroc, DLJM, Fiem, Munjal Showa etc.
  • Involved in part development and cost analysis.

Education

Indian Institute of Management Raipur

Master of Business Administration - MBA

Jan 2021Jan 2023

Harvard Business School Online

Disruptive strategy

Jan 2021Jan 2021

Thapar Institute of Engineering & Technology

Bachelor of Engineering (B.E.)

Jan 2012Jan 2016

Delhi Public School Noida

Science — Science

Jan 1997Jan 2011

Stackforce found 100+ more professionals with Project Management & Business Analysis

Explore similar profiles based on matching skills and experience