Gaurav Nagpal

Software Engineer

West Delhi, Delhi, India10 yrs 8 mos experience
Most Likely To SwitchHighly Stable

Key Highlights

  • Developed multiple Android applications for Shuttl.
  • Managed production processes at India YAMAHA Motor.
  • Graduated with a degree in Mechanical Engineering.
Stackforce AI infers this person is a Mobile Application Developer with experience in production engineering.

Contact

Skills

Core Skills

Android DevelopmentReact.jsProduction Management

Other Skills

AlgorithmsAndroid SDKAndroid StudioAssembly line managementAutoCADCSSData StructuresEngineeringFusedLocationApiGoogle Maps APIHTML5JSONJavaJavaScriptManufacturing

About

Working as Android developer at Shuttl. Experience in an automobile industry for 3 years as a production engineer. Graduated with a degree in Mechanical Engineering from Thapar University, Patiala,

Experience

Shuttl

Software Engineer

Sep 2018Present · 7 yrs 6 mos · Gurgaon, India

  • Built the Food & Beverages Android app used by agents to sell food to daily commuters
  • onboard their Shuttl buses. Has been used for over 2000 purchases. Built using Retrofit2 &
  • OkHttp3 and Picasso.
  • Built the Driver Training android app used by Operations team to educate drivers of their bus
  • route, pick up and drop points. Built using Google Maps API, FusedLocationApi,
  • Android services & Retrofit2.
  • Built the Vendor Search web app for the internal team. Built using ReactJs and Semantic-UI.
  • Worked on features like CleverTap (Analytics) and ChirpSDK (Audio QR) integration in the Shuttl App.
  • Responsible for stability and bug fixes in Shuttl Driver App.
Android DevelopmentJavaRetrofitGoogle Maps APIReact.js

India yamaha motor pvt. ltd.

2 roles

Production Engineer

Oct 2011Jul 2014 · 2 yrs 9 mos · Noida, India

  • Responsible for smooth functioning of the final body assembly line of multi-model motorcycle .
  • Safety maintenance: Managed the safety training and education to the concerned and ensured
  • prevention of near miss accidents by accident data recording and sharing with the safety team; Conducted daily meetings to provide 5S education to the operators
  • Material flow management: Spearheaded the implementation of material pulling system from other shops in order to exercise direct control thereby reducing losses & improving productivity on assembly line
  • Facility Maintenance: Initiated data analysis of past problems and monitoring of countermeasures through check sheets to reduce breakdown; Implemented mini tool crib concept by tool identification and location fixation; Managed 5S strengthening by implementing 5 kaizen target fixation; Directed the Identification of weak areas and scheduled repair plans
  • Quality Maintenance: Ensured daily SPR monitoring & coordinated with all shop negative contribution; Initiated hourly defect monitoring by real time analysis & feedback to concerned areas to avoid repetition; Planned ZDP training down the line; Sustenance of QMS through regular check & daily monitoring
Production ManagementQuality MaintenanceMaterial Flow ManagementSafety Maintenance

Intern

Jan 2010Jun 2010 · 5 mos

  • Responsible for synchronizing the pitch time of entire Fuel Tank welding line for FZ/FAZER model with the pitch time of final assembly line in order to facilitate smooth functioning of body assembly line by preventing any losses due to pitch time difference.
  • Identification of defects on assembly line and taking appropriate countermeasures, thereby improving Straight Pass Ratio.

Education

Thapar Institute of Engineering & Technology

Bachelor of Engineering (B.E.) — Mechanical engineering

Jan 2007Jan 2011

Hans Raj Model School

AISSCE — PCM

Jan 1995Jan 2007

Stackforce found 100+ more professionals with Android Development & React.js

Explore similar profiles based on matching skills and experience