sumer singh parihar

Project Manager

Bengaluru, Karnataka, India18 yrs 2 mos experience
Most Likely To SwitchHighly Stable

Key Highlights

  • Over 13 years of experience in project management.
  • Expert in commissioning instrumentation and control systems.
  • Proven track record in energy saving and productivity improvement projects.
Stackforce AI infers this person is a Project Management expert in the Energy and Automation sectors.

Contact

Skills

Core Skills

Project ManagementInstrumentationEngineeringAutomation

Other Skills

CalibrationCommissioningControl LogicControl Systems DesignDCSDistributed Control System (DCS)ESDElectrical EngineeringHMIsIndustrial AutomationMicrosoft OfficeModbusPLCPLC ProgrammingProcess Control

About

A seasoned professional with over 13.07 years of experience in: Project Management, Process Engineering / Enhancements, Client Management, System Engineering (DCS/ESD),Installation & Commissioning, Resource Management Vendor Management, Tool Room Operations / Instrumentation, New Product Development Skilled in handling commissioning of Instrumentation & Control Systems, Maintenance and Troubleshooting Functions of DCS Controller, PLC System and ESD System Hands-on experience in implementing various projects for energy saving, cost controlling & productivity improvements Proficient in handling execution of projects including installation and commissioning of equipments, interfacing with approving authorities and coordinating with engineering Adept at understanding overall operations for new products or improvement of existing products with thrust on reducing product cost Deft in recommending / implementing equipment calibrations to enhance operational efficiencies of the systems Possesses strong management, communication & interpersonal skills . CORE COMPETENCIES • Coordinating overall project activities right from the conceptualization stage to the execution. • Installing and commissioning as well as conducting tests & inspections to ensure operational effectiveness of plant & utilities; planning & effectuating maintenance schedules for equipment . • Designing layout, making drawing, approving them and carrying out inspection tests for determining the effectiveness of the plant/equipment. • Developing logic flow charts/ interlock diagrams as per requirement of process operations & for implementing related jobs. • Executing process measurement & control instrumentation & services to optimise processes.

Experience

Abb global industries and services limited

Project Lead

Feb 2023Present · 3 yrs 1 mo · Bangalore

Yokogawa india limited

2 roles

Deputy Manager

Feb 2011Feb 2023 · 12 yrs

Deputy Manager

Jan 2011Present · 15 yrs 2 mos

  • Project Engineer(DCS,ESD,SCADA) Commissioning & Engineering of metioned systems in Trunky project to meet the process requirements.
  • Projects Handled (C&I) in Yokogawa.
  • Working in Cairn India Ltd. Barmer Project.
  • Worked in Naptha Cracker Unit (NCU-IOCL) Panipat Project.
  • Worked in NFL (National Fertilizers Ltd.) Guna,M.P Project.
  • Worked in HMEL (Guru Govind Singh Refinery) Bathinda Project.
  • Worked in BORL (Bharat Oman Refinery Ltd.) Bina Project.
DCSESDSCADACommissioningEngineeringProject Management+1

Advanced systek

Project Engineer

Aug 2010Dec 2010 · 4 mos

  • Project Engineering & Commissioning of Terminal Automation in Oil terminals.
  • Role:
  • Administered project from its initial concepts of design & commissioning & monitoring the problems with implementing the efficient efforts for troubleshooting
  • Highlights:
  • Deft in maintaining the activities encompassing in the engineering of Terminal Automation of IOCL Kochi, IOCL Kozhikode, IOCL Haldwani
  • Efficeintly commissioned the IOCL Haldwani Terminal with all pump Automation & MOV Automation, Bay Automation
Terminal AutomationProject EngineeringCommissioningProject ManagementEngineering

Honeywell automation (i) ltd

Automation Engineer

Jan 2008Aug 2010 · 2 yrs 7 mos

  • Commissioning of Terminal Automation Projects In OIL Terminals.
  • Successfully handled operations on:
  • # Honeywell Plant Scape SCADA “R400 Hybrid Control, R320, R300”
  • # Honeywell DCS (EPKS) Release 3.2 and C200, C300 Controllers.
  • # GEFanuc PLC with Plantscape SCADA Servers and interfacing with third party
  • # Networking through Ethernet Networking, TCP IP, Switches, Hubs, Terminal server’s Systech and Emulex, Access Control System
  • # Mov automation, Honeywell SCADA, Field Instrumentations, Saab Radar Gauges, Toshniwal PD meter & Bermad DCV & Contrec & CMRK’s Batch Controllers
  • # Commissioning HZL Dariba Project for Acid System
SCADADCSPLCCommissioningAutomationProject Management

Education

Institute Of Technology & Management,Bhilwara

B.E — Electronics Instrumentation & Technology

Jan 2003Jan 2007

Stackforce found 100+ more professionals with Project Management & Instrumentation

Explore similar profiles based on matching skills and experience