Ravi Shankar Kumar

CEO

Gurugram, Haryana, India29 yrs 3 mos experience

Key Highlights

  • Over 30 years of MEP project management experience.
  • Expert in mechanical, electrical, and plumbing systems.
  • Proven track record in large-scale project execution.
Stackforce AI infers this person is a seasoned MEP project manager with expertise in construction and engineering.

Contact

Skills

Core Skills

Project ManagementMep Coordination

Other Skills

ConstructionDesignHVACMechanical EngineeringAutoCADProject PlanningConstruction ManagementMEP DesignPre-ConstructionEngineering Management

About

·         A Competent professional with over 30 years of experience in MEP project management & coordination of large commercial, IT Park, industrial & residential projects. ·         Extensive experience in, Design, Execution, Planning & Project Management related to Mechanical, Electrical, ELV, Plumbing (MEP), HVAC, Fire-fighting, WTP, STP& ETP. ·         Well versed in planning, design, project estimation, tendering, contract negotiations, project management, project monitoring & coordination, regulating material purchasing, site management & project execution. ·         Experience in execution/planning of a wide spectrum of mechanical, electrical, plumbing (MEP) projects from concept to commissioning. ·         Proven skills in execution of commercial, residential & industrial projects. ·         Proven skills in operation, preventive maintenance, and troubleshooting & energy management of all electromechanical equipments to get ‘ZERO’ down time. ·         Skilful in enhancing systems to bring greater cost efficiency levels within the timeframe. ·         Capable of Independently Handling Large Projects, Dealing with Architect, Consultants, Clients, Contractors etc.

Experience

Ireo private limited.

Sr. Vice President- Head MEP

Feb 2025Present · 1 yr 2 mos · Gurugram, Haryana, India · On-site

Orris group

Assistant Vice President - MEP Head

Dec 2023Feb 2025 · 1 yr 2 mos · Gurugram, Haryana, India · On-site

ConstructionDesignHVACMechanical EngineeringAutoCADProject Planning+6

Krisumi corporation

Assistant Vice president - MEP Head

Mar 2021Nov 2023 · 2 yrs 8 mos · Gurugram, Haryana, India

  • Key Deliverables: -
  • Þ      In-charge for MEP Part of the designated projects.
  • Þ      Responsible for Project Management
  • Þ      co-ordination with consultant/In-house Team for design of Building MEP system,
  • Þ      Verify the design and ensure delivery of drawings, Preparation of Budget,
  • Þ      coordination of Tendering activities, evaluation of Bids, Negotiation with Vendors, co-ordination with contractors for Execution of Electro-Mechanical work (i.e. HVAC, Electrical, ELV, Plumbing, Fire-fighting, DG, STP, WTP, Elevators, Electrical & Mechanical works etc.).
  • Responsibilities in Project Management & Coordination: -
  • Þ      Pre-construction design review and coordination of Building Electro-Mechanical System (i.e. review contract documents, uncover and resolve discrepancies, coordinate Shop Drawings, and coordinate Electro-Mechanical trades with general construction.
  • Þ      Monitoring of construction installation, field coordination, and problem solving (i.e. monitor construction progress and quality control, monitor and document system testing, verify rough-in locations, resolve ongoing coordination issues)
  • Þ      Co-ordination with Project architects & consultants on determining technical specifications and requirements, commissioning & preparation of building plans as per the Government Guidelines and timely drawing delivery.
  • Þ      Supervising execution of contracting works and approving contractor’s bills.
  • Þ      Track & control on material wastage, utilization of site resources effectively and Shop Drawings Submittals & approval.
  • Þ      Participating in project review meetings for evaluating project progress & de-bottlenecking.
  • Preparation of monthly progress reports and Periodic reviewing & monitoring
  • Þ      Preparation of monthly progress reports and Periodic reviewing & monitoring the progress of the project to ensure completion of project within the scheduled time and cost
ConstructionProject ManagementDesignHVACMechanical EngineeringAutoCAD+6

Conscient infrastructure private limited

General Manager - MEP Head

Mar 2017Mar 2021 · 4 yrs · Gurugram, Haryana, India

  • DESIGN/ENGINEERING, PROJECT MANAGEMENT, COORDINATION, PROCUREMENT & PROJECT EXECUTION FROM CONCEPT TO COMMISSIONING. Reviewing & evaluating the design brief reports as per National Building Code (NBC) & CPWD manuals. Coordination with architect, consultant & contractor to complete the project within the specified time & budget. Planning, scheduling, cash flow, and work order/BOQ preparation, billing, payment schedules, selection of vendors, negotiations, material procurement, budgeting, monitoring of site progress & schedule.
  • Independently handling complete MEP projects (Internal & External Electrification, HV / LV Cables, Switchgears, Control Panels, Sub Stations/Transformers, Generators, Boilers/Hot water generators, Street Lighting, Fire Alarm / Fighting System, P.A System, Telephone, CCTV, Piping, HVAC, Elevators &Escalators, Plumbing, Water Management, Drainage/Sewage, Building Management System, STP, WTP, Access Control System, Building Automation .
  • The Key Deliverables
  • Project Planning & Management
  • ú   Planning for on-site activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize the output.
  • ú   Finalizing requirements and specifications in consultation with Architect & consultant.
  • ú   Finalization of vendors & negotiations.
  • ú   Participating in project review meetings for evaluating project progress & de bottlenecks.
  • ú   Coordination for payments, running bill & final billings with the accounts & venders.
  • ú   Organizing regular periodic meetings & trainings for staff & engineers for discussing current work issues and devising solutions for enhanced operations.
  • ú   Participating in budget finalization with management.
  • ú   Developing new vendors and first trial of new projects and undertaking quality inspection as per specification.
  • ú   Tracking & scheduling the whole project from beginning to end.
ConstructionProject ManagementDesignHVACMechanical EngineeringAutoCAD+6

Ireo private limited.

Deputy General Manager -MEP

Jan 2014Nov 2016 · 2 yrs 10 mos · Gurugram, Haryana, India

  • Key Deliverables: -
  • Design Management: To monitor MEP Consultants Performance, MEP drawings from architects / consultants and provide valuable inputs with regards to services to ensure that there are no design flaws / omissions and the optimum services are being considered for execution of the job
  • Value engineering and provide guidance to concern with all aspects of services to ensure effective decision making. Benchmarking optimum services available and creating a data bank to standardize / customise services as per project requirement and quick reference as and when required
  • Assist the Contracts team in preparing cost estimates, budgets, etc as a subject matter expertise to ensure that there is no major deviations in cost estimates and also to provide feedback on services in existence and their durability / efficiency
  • Coordinate with internal and external resources for creating the Master plan with reference to STP, WTP, rain water harvesting, Green Building etc services to be implemented and providing value engineering recommendations to ensure the best possible services are being incorporated
  • Monitor work of contractors, to ensure that proper methods and technologies are being adapted while installation / execution of services to ensure durability / smooth functioning of equipments / resources and also there are zero / minimum maintenance required in the longer run
  • Coordinate with internal team, consultants, contractors for execution of the MEP works and troubleshooting of hurdles / problems, if any to ensure that the project is not delayed and ensuring that the MEP works are carried out as per standards and in accordance with the Project timelines
  • Attend Project review meetings to monitor design & site progress and resolve issues, Prepare various MIS and circulate to all concerned. Monitor budget for all MEP works and certification of bills, claims, etc by Consultants & Contractors. Assist in preparation of various analysis as and when required.
ConstructionProject ManagementDesignHVACMechanical EngineeringAutoCAD+6

Emaar india

Assistant General Manager -MEP

Sep 2010Jan 2014 · 3 yrs 4 mos · Gurugram, Haryana, India

  • ROLE & RESPONSIBILITIES
  • Strategize and monitor projects to make sure delivery of the projects taking into consideration time, cost and specifications.
  • Answer to all the queries, suggest alternatives and approval of shop drawings. Coordinate with procurement department to resolve the queries.
  • Monitor & review the finalized architectural detailed drawings of the project keeping in mind the viability of the project from a MEP/ Services perspective and address the queries/ issues from Architectural & Planning team.
  • Update the relevant authorities on the current project status and escalate the issues in case of delays.
  • Handle consultants, contractors, suppliers and engineers to ensure that the project meets its development compliance objectives. Also, recommends & prepares tender list for the procurement of contractors and consultants.
  • Lead meetings with all the MEP/ services contractors to explain the key points of the projects and thus mobilize
  • Ensure that the quality & quantity of the materials are checked by the QA/QC & QS teams
  • Stay abreast of the recent developments in the industry and updating the team on the same to ensure that the team stays competitive.
  • Coordinate with the concerned Municipal & Service authorities on all matters related to MEP provisions.
  • Support in the preparation of the budgets for the projects and supervise the same.
  • Document project progress through reports which can be used as contractual aids during disputes.
  • Be adept in and aware of International & Local Building codes of all MEP systems.
  • Ensure compliance of construction activity to best industry standards, international codes, planned timelines, allotted budget, company strategy and goals.
  • Review CAD drawings, layouts, study models, documents and calculations prepared by consultants.
ConstructionProject ManagementDesignHVACMechanical EngineeringAutoCAD+6

Vatika group

Senior Manager

Aug 2009Aug 2010 · 1 yr · Gurugram, Haryana, India

  • Experience in Residential/Commercial/ High rise / Mix development buildings projects.
  • Experience in Mechanical, Electrical and Plumbing systems
  • Reviewing RFPs and Tender documents, Specifications, Basis of Design and drawings so as to determine the scope of work and required contents to prepare accurate and efficient materials and labour estimates on all project stages and project related works.
  • Preparation/review of Electrical, ELV, Plumbing, fire fighting & HVAC related technical queries to be sent to the Client for pre-bid meeting.
  • Maintaining Cost database of various MEP services like Electrical, ELV, Plumbing, fire fighting & HVAC items and ensuring the periodic updating of the data maintained in the section.
  • Technical & Commercial analysis of the quotation with respect to exclusions, assumptions & deviations.
  • Negotiating with suppliers & sub-contractors to obtain most competitive quotes.
  • Design & costing support for ongoing projects whenever required with Project management & Electrical Plumbing, fire fighting, HVAC design team.
  • Update of MEP vendor list, price list, contractor list in regular intervals in our library.
  • Prepare and review all MEP BOQ quantity and rate analysis of projects.
  • Review of shop drawings and materials submittals of MEP Nominated contractor for compliance with project requirements and forwarding to consultants
  • Site visits for supervision and monitoring the progress of MEP Nominated Contractor
  • Attending Work Progress Review Meetings with the Consultants/Clients and related correspondence
  • Review & ensuring of MEP clearances for civil & related works
  • Attending commissioning, testing and handing over meetings
  • Review of O & M Manuals and As-Built Drawings of MEP services and forwarding to consultants
ConstructionProject ManagementDesignHVACMechanical EngineeringAutoCAD+6

Pearl global industries ltd (pgil)

Senior Manager

May 2005Jan 2009 · 3 yrs 8 mos · Gurugram, Haryana, India

  • §  Read Electrical drawings, wiring diagrams (SLD), schematic / working drawings, ensure correctness & as provision as per requirement & issue the drawing to sites for construction.
  • §   Optimized the electrical circuits, Sizing of DG& Transformer, right selection of cables & electrical accessories.
  • §  Calculations and water requirements, Crosschecking of water balancing chart, Design of right size of STP.
  • §   Verifying the plumbing layout/ firefighting layout, Pump room & optimized the design.
  • §  Cross check the clashing of service with each other.
  • §  Calculation of power requirement area wise, flat wise for entire project & worked out connected load, Maximum demand, applied load etc.
  • §  Work out the scheme for building automation, access control & building management system & implementation of the same on the project.
  • §   Selection of HVAC systems including chillers, ducting, insulation, exhaust, fresh airs etc and optimized the design to get maximum comfort with value engineering on all activities.
  • §  Coordinate with other consultant like Architects, Interior designer & landscape consultant.
  • §  Monitor each project in term of timely delivery of drawings, quality of drawing, though checking of tenders to avoid extra items, minimize QRO item & reworks.
  • §   Communicate with project management person on sites about drawing deliverable, decision, changes, addition alteration in specification for smooth functioning of sites.
  • §  Organize site meeting with project management & consultant for trouble shooting the site-specific requirements.
  • §  Visit the sites as and when required to resolve site related queries.
  • §   Understanding the liasoning requirement in terms structure & MEP and incorporate same while obtain design from respective consultant.
  • §  Assist management to exercise value engineering to reduce the cost with out cutting amenities / features
ConstructionProject ManagementDesignHVACMechanical EngineeringAutoCAD+6

Panex overseas

Manager

Jan 2003May 2005 · 2 yrs 4 mos · Delhi, India

  • Responsible for planning & execution of projects in given timeframe. Complete site execution in respect of mechanical, electrical, plumbing (MEP), fire fighting, HVAC, WTP ( Softener, Super softener, filters, DM Plants, RO) STP, ETP & other electromechanical equipments. Coordination with other related department like civil & interior activities venders. Responsible for total execution of the project as per specification and contractual terms, project planning, scheduling, developing and implementing process and controlling quality, funds, time & cost, checking & verification of bills & effective liaison as well as coordination with architect, consultants, contractors & other external agencies. Tenders / Vendors finalization, negotiation, estimation, rate analysis, review claims, variations & valuations, maintain budgetary statements, monitor cost expenditure & motivation of project team.
Project ManagementDesignHVACAutoCADProject PlanningMEP Coordination+4

Gupta exim (india) pvt. ltd.

Engineering Manager

Feb 2001Jan 2003 · 1 yr 11 mos · Faridabad, Haryana, India

  • Responsible for Installation, commissioning, Operation, Maintenance & servicing of HVAC, Plumbing, firefighting, Water Treatment Plants ( Filters, Softeners, DM Plants, RO Plants), Sewage Treatment Plant(STP) & Effluent Treatment Plant with its piping & all accessories and other mechanical and electrical (MEP) installations. Implementation of electromechanical installation as per approved drawings. Erection, testing, commissioning of electromechanical equipments. i.e. DG set, HVAC systems, Fire protection, detection systems and laundry equipments. Strategic planning, resource management, developing & monitoring scheduling, track & manage progress by controlling time, cost & scope, while leading a cohesive of multi-disciplinary professionals & coordinating between architect, consultants, contractors & other government agencies. Vendor finalization, negotiation, quantity estimation and verification, budgetary statements, rate analysis, review claims and variations, verification, checking & certification of bills, quality assurance & quality control and & motivation of project team for achievements of targets. Overall responsibility of the operation and maintenance of the electromechanical equipments.
Project ManagementHVACAutoCADMEP CoordinationConstruction ManagementMEP Design

Ecotherm engineers private limited

Senior Engineer

Jun 1997Feb 2001 · 3 yrs 8 mos · Faridabad, Haryana, India · On-site

  • Responsible for developing a suitable plant layout after conducting Research for the Design and Detailing of the project. Coordinating with Client in the selection of Type & sizing/capacity of equipments (type & sizing of Heating equipments, Water Treatment Plants, compressor & chillers etc.) after calculating their process requirement & load. Erection, Commissioning and servicing of Non-IBR Boiler, Thermic Fluid Heater, Hot water Generator, Chillers, Water Treatment Plants (Softening Plant, Super Softening Plant, DM Plant, R.O Plant & Filters), ETP & compressor. Design, Drawing(Isometric),finalization of technical specs for purchasing of piping & its accessories, BOQ preparation, for STEAM, HOT/CHILLED WATER LINE, COMPRESSED AIR LINE with all its accessories after analyzing client’s requirement, site condition & other parameters. Preparing the tender documents and scrutinizing the quotation, discuss with supplier and finalise recommendations for placement of purchase orders. Proper coordination with suppliers, contractors, & client to complete the project within specified time & budget.
Project ManagementMEP CoordinationMEP Design

Kvs international private limited

Project Engineer

Dec 1995Jun 1997 · 1 yr 6 mos · Faridabad, Haryana, India

  • Responsible for Erection of IBR Boiler including their accessories (Ducting, Chimney, Steel Structure platform, ID & FD Fans, H.R.U. and Dust Collector).  Installation  & commissioning of Non- IBR Boilers, Hot Water Generators, Thermic Fluid Heaters, Water Treatment Plants (Filters, Softener, Super softeners, DM & RO Plants).  Design, preparation of Isometric Drawing & layout, preparation of BOQ, procurement of material and complete execution, testing & commissioning of STEAM, THERMIC FLUID, PNEUMATIC and WATER LINE work at site. Tendering cost estimation and execution of complete fire fighting system including their testing & commissioning. Co-ordination and liaison with Architects, Consultants, Contractors and Engineers with regard to work execution.
Project ManagementMEP Coordination

Education

B S S COLLEGIATE SCHOOL BEGUSARAI

Bachelor of Engineering - BE — Mechanical Engineering

Jul 1991Aug 1995

Stackforce found 100+ more professionals with Project Management & Mep Coordination

Explore similar profiles based on matching skills and experience