Jason Ossey

Director of Engineering

Atlanta, Georgia, United States21 yrs 8 mos experience
Most Likely To SwitchHighly Stable

Key Highlights

  • Director of Global Network Infrastructure at Google
  • Expert in data center project execution
  • Proven track record in capital project management
Stackforce AI infers this person is a leader in Infrastructure and Operations within the tech industry.

Contact

Skills

Other Skills

EngineeringProject ManagementManufacturingCommunicationCapital ProjectsProcess ImplementationLean ManufacturingKaizenRoot Cause AnalysisContinuous ImprovementAutoCAD5SInjection MoldingManagementManufacturing Operations Management

Experience

Google

5 roles

Director, Global Network Infrastructure

Promoted

Dec 2024Present · 1 yr 4 mos

Global Network Delivery - North America

Promoted

Oct 2021Dec 2024 · 3 yrs 2 mos

  • Leading the North American team responsible for implementing Edge, WAN, and Datacenter infrastructure solutions.

Manager - Data Center Delivery

Jun 2019Oct 2021 · 2 yrs 4 mos

  • Driving successful execution and on-time completion of data center projects across North America.

Technical Program Manager - Business Operations and Strategy

May 2018Jun 2019 · 1 yr 1 mo

  • Enabling the development of continuous improvement strategies, reporting, and communication for Global Infrastructure Delivery, driving optimized Cluster Networking, Cloud Capacity, and ML deployments.

Technical Program Manager - Data Center Deployments

May 2015May 2018 · 3 yrs

  • Technical Program Manager spearheading data center capacity expansion and global infrastructure program execution.

Bway corporation

Project Engineering Manager

Aug 2013Apr 2015 · 1 yr 8 mos

Ihold llc

iHold

Jun 2012Jul 2017 · 5 yrs 1 mo

  • Loose your wallet! The ultimate iphone wallet case.
  • www.iholdcase.com

Ramah darom

Board of Directors

Jul 2010Present · 15 yrs 9 mos

Bway corporation

2 roles

Plant Engineer

Oct 2009Nov 2010 · 1 yr 1 mo

  • Oversaw all capital projects and purchases for Atlanta facility; Designed and installed automated manufacturing lines; Created new cellular plant layout for Atlanta facility
  • Promoted to Head Engineer on site; Solely responsible for management and oversight of more than 60 projects amounting to $2.5 million in 2009 alone
  • Managed $1.5 million budget for complete facility overhaul, including facility redesign to increase output and production efficiencies, as well as the relocation, removal or installation of over 40 manufacturing lines
  • Led successful initiative to obtain first company Volatile Organic Compounds-free status in North America

Corporate Project Engineer

May 2007Aug 2013 · 6 yrs 3 mos

  • Directed over $4 million in capital projects for 13 facilities in 2012 and will manage $15 million in capital projects in 2013; Integrated multiple new acquisitions from a technical standpoint; Rationalized two facilities in order to optimize operations and EBITDA; Designed new utility systems for multiple injection molding facilities
  • Solely responsible for $1.4 million budget for facility rationalization and integration into four facilities
  • Managed $1.2 million facility closure that will result in estimated synergies of $1.4 million
  • Devised and implemented printing initiative which increased productivity by over 400%
  • Created new pail handle for a specific customer that will lead to labor savings of $144M

Ball corporation

3 roles

Plant Engineer

Jan 2009Oct 2009 · 9 mos

  • Promoted to Head Engineer on site; Solely responsible for management and oversight of 60 projects
  • Managed Kaizen and Lean Manufacturing efforts
  • Utilize cutting edge techniques to design superior products developed with 100% recyclable material
  • Improved process efficiency by creating new color delivery system for injection molding lines
  • Led facility initiative and successfully obtained first Ball Corporation Volatile Organic Compounds (VOC) free status in North America; Produced protocols for Storm Water exempt facility
  • Designed and installed three automated manufacturing lines

Kaizen Team Leader

May 2007Oct 2009 · 2 yrs 5 mos

  • Oversaw and guided a group of 20 group members; Direct problem solving efforts in a goal-oriented manner
  • Established innovative scheduling system that led to reduction of plant scheduling process by 12 hours per week and condensed the amount of time required to schedule production
  • Designed production scrap control system to monitor defects
  • Implemented metrics and procedures to increase uptime
  • Devised Kanban inventory level monitoring protocol using multiple forecasts

Engineer

May 2007Dec 2008 · 1 yr 7 mos

  • Supervised, designed, and implemented installation of the largest production cell in the plant
  • Managed $1.2 million budget for automated production cell of rigid hard top containers
  • Developed priority flow control using photo eye control system
  • Implemented Lean Manufacturing and 5S for production cell
  • Facilitated purchase orders with multiple contractors

Manheim

Senior Design Project

Oct 2007May 2008 · 7 mos

  • Invented new lot layout design and vehicle storage protocol that reduced costs by $1.5 million per year per facility; Planned implementation of new approach at more than 100 facilities
  • Analyzed vehicle flow through pre-auction process and constructed vehicle release strategies

Picturethis! llc and goodball

Owner and Founder

Aug 2004Jul 2017 · 12 yrs 11 mos

  • Owner and Founder

Education

Duke University - The Fuqua School of Business

Master of Business Administration (M.B.A.)

Jan 2014Jan 2015

Georgia Institute of Technology

Bachelor of Science — Industrial and Systems Engineering

Jan 2004Jan 2008

Georgia Institute of Technology

Certificate — Entrepreneurship

Jan 2004Jan 2008

Stackforce found 100+ more professionals with Engineering & Project Management

Explore similar profiles based on matching skills and experience