Chad Bareither

Co-Founder

Kalamazoo, Michigan, United States18 yrs 8 mos experience
Highly Stable

Key Highlights

  • Generated over $4M in new revenue.
  • Reduced operational costs by $1.5M.
  • Improved quality by 80% in inventory transactions.
Stackforce AI infers this person is a Lean Management expert with a strong focus on continuous improvement in manufacturing and consulting.

Contact

Skills

Core Skills

WritingContinuous ImprovementLean ManagementLean Operating SystemLean Business TransformationBusiness Process ImprovementLean Six SigmaReliability Engineering

Other Skills

Non-fiction WriterLean methodologiesKaizenManagement ConsultingLeadershipSix SigmaLean ManufacturingProgram ManagementProcess ImprovementData AnalysisStatisticsDesign of ExperimentsProject PlanningProject ManagementValue Stream Mapping

About

𝙄𝙚 𝙮𝙀𝙪𝙧 𝙗𝙪𝙚𝙞𝙣𝙚𝙚𝙚 𝙜𝙧𝙀𝙬𝙞𝙣𝙜 ... 𝙗𝙪𝙩 𝙮𝙀𝙪𝙧 𝙢𝙖𝙧𝙜𝙞𝙣𝙚 𝙖𝙧𝙚 𝙚𝙧𝙀𝙙𝙞𝙣𝙜? 𝘿𝙀 𝙮𝙀𝙪 𝙬𝙖𝙣𝙩 𝙩𝙀 𝙜𝙧𝙀𝙬 ... 𝙗𝙪𝙩 𝙛𝙚𝙖𝙧 𝙮𝙀𝙪 𝙘𝙖𝙣'𝙩 𝙛𝙞𝙣𝙙 𝙩𝙝𝙚 𝙘𝙖𝙥𝙖𝙘𝙞𝙩𝙮 𝙀𝙧 𝙚𝙭𝙥𝙖𝙣𝙙 𝙛𝙖𝙚𝙩 𝙚𝙣𝙀𝙪𝙜𝙝? 𝘌𝙧𝙚 𝙮𝙀𝙪 𝙬𝙧𝙚𝙚𝙩𝙡𝙞𝙣𝙜 𝙩𝙀 𝙙𝙚𝙡𝙞𝙫𝙚𝙧 𝙘𝙪𝙧𝙧𝙚𝙣𝙩 𝙫𝙀𝙡𝙪𝙢𝙚 ... 𝙖𝙣𝙙 𝙬𝙀𝙧𝙧𝙮 𝙖𝙗𝙀𝙪𝙩 𝙡𝙀𝙚𝙞𝙣𝙜 𝙘𝙪𝙚𝙩𝙀𝙢𝙚𝙧𝙚? 𝐀𝐂𝐓𝐔𝐀𝐋 𝐑𝐄𝐒𝐔𝐋𝐓𝐒 - generate $4M+ in new revenue - decrease production lead time by 52% - reduce operational costs by $1.5M - improve quality by 80% in inventory transactions 𝐂𝐋𝐈𝐄𝐍𝐓𝐒 𝐀𝐑𝐄 𝐒𝐀𝐘𝐈𝐍𝐆 "𝘛𝘩𝘊 𝘣𝘰𝘵𝘵𝘰𝘮 𝘶𝘱 𝘢𝘱𝘱𝘳𝘰𝘢𝘀𝘩 𝘰𝘧 𝘧𝘪𝘯𝘥𝘪𝘯𝘚 𝘱𝘳𝘰𝘣𝘭𝘊𝘮𝘎, 𝘀𝘰𝘭𝘭𝘊𝘀𝘵𝘪𝘯𝘚 𝘥𝘢𝘵𝘢 𝘢𝘯𝘥 𝘢𝘎𝘎𝘰𝘀𝘪𝘢𝘵𝘊𝘥 𝘀𝘰𝘎𝘵 𝘎𝘢𝘷𝘪𝘯𝘚𝘎 𝘞𝘢𝘎 𝘊𝘺𝘊-𝘰𝘱𝘊𝘯𝘪𝘯𝘚. 𝘛𝘩𝘊 𝘵𝘊𝘢𝘮 𝘞𝘢𝘎 𝘧𝘶𝘭𝘭𝘺 𝘪𝘯𝘷𝘊𝘎𝘵𝘊𝘥 𝘪𝘯 𝘱𝘳𝘰𝘣𝘭𝘊𝘮 𝘎𝘰𝘭𝘷𝘪𝘯𝘚 𝘢𝘯𝘥 𝘀𝘰𝘎𝘵 𝘎𝘢𝘷𝘪𝘯𝘚 𝘮𝘊𝘢𝘎𝘶𝘳𝘊𝘎." - Global Quality Director, Good Foods Group “𝘉𝘳𝘪𝘯𝘚𝘪𝘯𝘚 𝘊𝘩𝘢𝘥 𝘪𝘯𝘵𝘰 𝘵𝘩𝘊 𝘣𝘶𝘎𝘪𝘯𝘊𝘎𝘎 𝘵𝘰 𝘩𝘊𝘭𝘱 𝘎𝘰𝘭𝘷𝘊 𝘢 𝘱𝘳𝘰𝘣𝘭𝘊𝘮 𝘞𝘢𝘎 𝘵𝘩𝘊 𝘣𝘊𝘎𝘵 𝘪𝘯𝘷𝘊𝘎𝘵𝘮𝘊𝘯𝘵 𝘞𝘊 𝘀𝘰𝘶𝘭𝘥 𝘩𝘢𝘷𝘊 𝘮𝘢𝘥𝘊! ... 𝘵𝘩𝘊 𝘧𝘢𝘀𝘵 𝘵𝘩𝘢𝘵 𝘵𝘩𝘊 𝘎𝘵𝘢𝘧𝘧 𝘞𝘢𝘎 𝘢𝘣𝘭𝘊 𝘵𝘰 𝘱𝘢𝘳𝘵𝘪𝘀𝘪𝘱𝘢𝘵𝘊 𝘢𝘯𝘥 𝘳𝘊𝘀𝘊𝘪𝘷𝘊 𝘵𝘳𝘢𝘪𝘯𝘪𝘯𝘚 𝘪𝘯 𝘵𝘩𝘊 𝘱𝘳𝘰𝘣𝘭𝘊𝘮 𝘎𝘰𝘭𝘷𝘪𝘯𝘚 𝘢𝘱𝘱𝘳𝘰𝘢𝘀𝘩.” [80% revenue increase in 6 weeks] - General Manager, The Dome Sports Center “𝘞𝘊'𝘷𝘊 𝘪𝘯𝘀𝘳𝘊𝘢𝘎𝘊𝘥 𝘰𝘶𝘳 𝘎𝘵𝘳𝘢𝘵𝘊𝘚𝘪𝘀 𝘊𝘮𝘱𝘩𝘢𝘎𝘪𝘎 𝘎𝘰 𝘵𝘩𝘢𝘵 𝘞𝘊'𝘳𝘊 𝘯𝘰𝘵 𝘰𝘯𝘭𝘺 𝘳𝘊𝘎𝘰𝘶𝘳𝘀𝘪𝘯𝘚 𝘢𝘯𝘥 𝘱𝘳𝘪𝘰𝘳𝘪𝘵𝘪𝘻𝘪𝘯𝘚 𝘱𝘳𝘰𝘫𝘊𝘀𝘵𝘎 𝘵𝘩𝘢𝘵 𝘪𝘮𝘱𝘢𝘀𝘵 𝘰𝘶𝘳 𝘱𝘰𝘳𝘵𝘧𝘰𝘭𝘪𝘰 𝘣𝘶𝘵 𝘢𝘭𝘎𝘰 𝘊𝘯𝘎𝘶𝘳𝘪𝘯𝘚 𝘵𝘩𝘢𝘵 𝘞𝘊’𝘳𝘊 𝘢𝘱𝘱𝘭𝘺𝘪𝘯𝘚 𝘢 𝘥𝘢𝘵𝘢-𝘥𝘳𝘪𝘷𝘊𝘯 𝘢𝘱𝘱𝘳𝘰𝘢𝘀𝘩 𝘵𝘰 𝘪𝘥𝘊𝘯𝘵𝘪𝘧𝘺𝘪𝘯𝘚 𝘢𝘯𝘥 𝘢𝘥𝘥𝘳𝘊𝘎𝘎𝘪𝘯𝘚 𝘳𝘰𝘰𝘵 𝘀𝘢𝘶𝘎𝘊𝘎.” [$7.7M in cost savings and 36 FTE productivity gains] —Research Director, Fortune 500 Pharmaceutical Company “𝘐𝘵’𝘎 𝘢 𝘭𝘰𝘵 𝘊𝘢𝘎𝘪𝘊𝘳 𝘵𝘰 𝘩𝘢𝘯𝘥 𝘵𝘩𝘪𝘯𝘚𝘎 𝘰𝘧𝘧 𝘞𝘩𝘊𝘯 𝘺𝘰𝘶 𝘩𝘢𝘷𝘊 𝘢 𝘱𝘳𝘰𝘀𝘊𝘎𝘎. 𝘞𝘊’𝘳𝘊 𝘭𝘪𝘚𝘩𝘵 𝘺𝘊𝘢𝘳𝘎 𝘢𝘩𝘊𝘢𝘥 𝘰𝘧 𝘞𝘩𝘊𝘳𝘊 𝘞𝘊 𝘞𝘊𝘳𝘊.” [Increased % On-Time Delivery] - Engineering Director, Fortune 500 BioPharma 𝐇𝐎𝐖 𝐖𝐄 𝐃𝐎 𝐈𝐓 The Focus and Align Framework integrates best-practices from Operational Excellence programs Lean, Six Sigma, and Organizational Change Management to build a system for sustainment 𝘞𝘏𝘐𝘓𝘌 we improve performance. 𝐖𝐀𝐍𝐓 𝐓𝐎 𝐋𝐄𝐀𝐑𝐍 𝐌𝐎𝐑𝐄? Click on the link below to schedule a call: https://www.bareithergroup.com/contact

Experience

18 yrs 8 mos
Total Experience
3 yrs 7 mos
Average Tenure
2 yrs 4 mos
Current Experience

Family & children services, inc.

Board Member

Jan 2024 – Present · 2 yrs 4 mos · Kalamazoo, Michigan, United States

  • Member of Board of Directors and Operations Committee

Bareither group consulting, llc

2 roles

Author

Oct 2023 – Present · 2 yrs 7 mos

  • Improve LESS: The Focus and Align Framework for Sustainable Continuous Improvement
  • https://www.bareithergroup.com/improveless
  • Top release in Lean Management category
Non-fiction WriterWriting

Owner & Principal

Oct 2018 – Present · 7 yrs 7 mos

  • Continuous Improvement doesn't need to be complicated. It's not always easy ... but it can be simple.
  • It's just a set of Tools, organized in a system, delivered through a process. ​
  • Keep focused on a strategic direction.
  • Enable the organization to repeatably solve challenging problems.
  • Empower teams to manage daily performance.
  • Implement a business system that helps you focus and align. Where you can actually Improve LESS ... and get better restults.
Continuous Improvement

Lean solutions

Lean Coach

Oct 2023 – Nov 2025 · 2 yrs 1 mo · Allendale, Michigan, United States

  • Teach, Implement, and Coach Lean Management best-practices with clients across industries. From enterprise-wide business system development to shop floor problem solving and kaizen.
Lean Management

Niprocur

Lean Consultant

Oct 2022 – Sep 2023 · 11 mos · Hybrid

  • Develop and deploy enterprise-wide lean operating system from front-line through executive leadership.
Lean Operating System

Consumers energy

Director of Lean

Jun 2018 – Mar 2022 · 3 yrs 9 mos · Jackson, Michigan Area

  • Leading the lean business transformation; including the ongoing development and deployment of our lean operating model, strategic roadmap and establishing standards to achieve breakthrough results in business performance
Lean Business Transformation

Stryker

Sr Manager, Continuous Improvement, Global Supply

Jan 2017 – Jun 2018 · 1 yr 5 mos

  • Central CI team member, responsible for the development and deployment of a standard Lean production system for global manufacturing operations.
  • led kaizen events that exposed front-line, support staff and management to lean methodologies
  • coached leadership on Lean methodologies and cultural transformation
  • returned $8.375M in operating income to the business
  • led Lean transformation projects for assembly plant that resulted in $1.4M in savings
  • coached Lean transformation of manufacturing site, resulted in $6.3M in savings
  • chaired Lean Sigma Council community of practice to set strategy and direction for continuous improvement
Lean methodologiesKaizenContinuous Improvement

West lake improvement association 0f kalamazoo county michigan

Director

May 2015 – May 2017 · 2 yrs · Portage, Michigan, United States

  • Member of Board of Directors, represented resident concerns and priorities to local, county, and state government.

Stryker

2 roles

Business Process Improvement Manager

Sep 2013 – Jan 2017 · 3 yrs 4 mos

  • Partner with Value Chain Owners, functional System Owners and Business Leaders to define core business processes, strategically align opportunities and promote continuous improvement.
  • Increased membership 40%, drove collaboration up 300% for Continuous Improvement community of practice
  • Supported Kaizen events to identify 8400+ hrs of non-value added work to elimination
  • Enhanced spend analysis to achieve 5% reduction in indirect expenditure for R&D
  • Identified critical path activities and improvement opportunities to reduce time to market for new products
  • Decreased level of effort for repair inventory management by > 75%
  • Reduced vendor notification lead time for nonconforming material by 40%
  • Reduced quality system change control lead time by 23%
  • Supported value stream efforts to reduce depot repair lead time by > 25%
  • Mentored call center consolidation processes, maintained service level with 12% reduced headcount
Business Process Improvement

Associate Business Process Improvement Manager

Sep 2013 – Mar 2015 · 1 yr 6 mos

  • Partners with Systems Owners and Business Leaders in Service, Human Resources, and Distribution to define core business processes, identify opportunities, analyze root causes, and develop solutions to promote continuous improvement.
  • Decreased level of effort for repair inventory management by > 75%
  • Reduced vendor notification lead time for nonconforming material by 40%
  • Reduced quality system change control lead time by 23%
  • Supported value stream efforts to reduce depot repair lead time by > 25%
  • Mentored call center consolidation processes, maintained service level with 12% reduced headcount
Business Process Improvement

Us army

3 roles

Lean Six Sigma Black Belt

Mar 2011 – Sep 2013 · 2 yrs 6 mos · Picatinny Arsenal, NJ

  • Responsible for training, consultation, and deployment of Lean and Six Sigma principles, methods, and tools to facilitate continuous improvement
  • Provided classroom training for 200+ Green Belt and Black Belt candidates
  • Mentored 15 Belt candidates through certification projects
  • Delivered $2.0M+ in annual cost avoidance through improvement efforts

Reliability Engineering Team Lead

Promoted

Jan 2010 – Mar 2011 · 1 yr 2 mos · Picatinny Arsenal, NJ

  • Led team in Design for Reliability, Reliability Program Planning, and Reliability Analysis for developmental programs and matured new capabilities for reliability modeling and allocation
  • Developed probabilistic reliability allocation model for new product design
  • Verified reliability threshold for multi-million dollar development project
Lean Six Sigma

Quality Engineering Team Lead

Jan 2006 – Dec 2009 · 3 yrs 11 mos · Picatinny Arsenal, NJ

  • Led team of Quality Engineers that supported development and production of munition commodities
  • Developed training curriculum for acceptance of product and deliverd to over 10 sites (Government and contractor)
  • Validated design change that resulted in approximately $25k material cost savings per year
  • Created reliability and shelf life validation protocol for new product fielding (release to troops)
Reliability Engineering

Education

Rutgers University

MS — Statistics (Quality & Productivity Management)

Jan 2007 – Jan 2010

Rutgers University

MS — Industrial Engineering (Quality & Reliability)

Jan 2004 – Jan 2005

Michigan Technological University

BS — Mechnical Engineering

Jan 1999 – Jan 2003

Stackforce found 100+ more professionals with Writing & Continuous Improvement

Explore similar profiles based on matching skills and experience