N

Nikhilesh Kumar

CEO

Hyderabad, Telangana, India17 yrs 8 mos experience
Most Likely To SwitchHighly Stable

Key Highlights

  • Co-Founder of a climate-focused tech startup.
  • Led multi-million dollar projects in petrochemical and energy sectors.
  • Expert in leveraging IoT for agricultural and urban solutions.
Stackforce AI infers this person is a leader in Environmental Technology and Project Management across multiple sectors.

Contact

Skills

Core Skills

Project ManagementBusiness DevelopmentBusiness Process ImprovementControl EngineeringOperation Management

Other Skills

DCSProject EngineeringEngineeringP&IDProcurementAutomationOperations ManagementPLCVendor ManagementBusiness StrategySite ManagementManagementManufacturingPolysiliconSolar Energy

Experience

17 yrs 8 mos
Total Experience
3 yrs 6 mos
Average Tenure
10 yrs 8 mos
Current Experience

Vassar labs

Co-Founder & CEO

Oct 2015Present · 10 yrs 8 mos · Hyderabad Area, India

  • Leveraging emerging Technologies IoT, Big Data, ML/AI, Cloud & Mobile Solution to solve key problems in
  • Water
  • "How much Water do we have now? how is spread across reservoirs, ground water, soil moisture, MI Tanks etc? How much and where is it used across the year? Where is Ground water and Fresh water depleting? What can be done to conserve them?"
  • Agriculture
  • "What is the right crop a farmer should choose as per his weather condition, soil type, market access to minimise crop failure and maximise economic output? How much fertiliser should the farmer apply? When should he sow the crop based on historical, current and forecasted weather to minimise crop failure? Which farms will come under severe soil moisture stress in next 7 days and needs intervention to save the crop? What amount of irrigation is needed? Which farms will be attached by what pest and diseases? What is the yield ? Where should the Farmer Markets be ?
  • Smart City
  • Realtime monitoring of cities resources, services, compliances, and grievances.
Project ManagementDCSProject EngineeringEngineeringP&IDProcurement+33

Sepam

ACIS Manager

Jan 2014May 2015 · 1 yr 4 mos · Khobar

  •  ACIS Business unit Manager for MENA-region – (Business development and Project operations)
  • Drove the over-all P&L of the division with a target of $30m sales, by managing business development and project operations.
  • Prepared business plan for the next 5 years and current year for my business division, inline to the mission of the company.
  • Conduct market-intelligence to generate leads, and identify and prioritize strategic projects in line to division’s business and policy.
  • Managed and maintained relationship with the existing client while pursuing them to expand the scope and get new job.
  • Partnered with finance to analyze the regional spend data project wise to identify areas of performance and improvement.
  • Launched the project operations by staff and resource planning, recruiting and procuring shortfalls, and setting on-site facilities.
  • Prepared project based execution strategy, budget, and cash flow, and program managed multiple projects across their life cycle.
  • Prepare management report to summarize target vs actual, spend vs budget, planned vs forecast that help in decision making.
  •  Project Director (Fire and gas upgrade project at Petro-chemical facility)
  • Managed an EPC project in crisis with a team of 120 people from mixed culture to accelerate project progress and control cost.
  • Managed stake-holders, project team and vendors to resolve technical, change management and commercial issues.
  • Presented contract changes summary of $ 8 m to client’s senior management and mediated the contract change conflict.
  • Pushed invoicing and payment from the client side and re-negotiated credit terms with sub-contractors to revive project cash flow.
  • Conducted one on one with functional leads to re-align their KPIs with project need and extended support to make it success.
  • Improved business processes to bring efficiency across various project functions such as procurement, engineering, finance etc.
Project ManagementBusiness DevelopmentMarket IntelligenceP&L ManagementStakeholder ManagementBudgeting+2

Lanco

2 roles

LLP1 - (Lanco Leadership Program - Level 1 ) - Assistant Manager

Mar 2012Mar 2013 · 1 yr

  • Led 5 member team for business processes improvement of Lanco’s consolidated divisions.
  • Drafted new Quality Management System that facilitated SAP integration between various functions and reduced procurement cycle.
  • Among the Top 0.5% in the organization to be selected in Lanco’s prestigious Leadership Program.
  • Conducted Enterprise Risk management for the post merged divisions of Lanco and built Risk response matrix.
  • Worked with Top Managers and CXOs to do Business process improvement and drive change management.
  • Applied “As Is study”, Gap Analysis, and SIPOC model to rebuild Quality Manual and nine department manuals.
  • Applied lean SIX sigma methods to improve efficiency and reduced over-all cycle time of business processes.
Business Process ImprovementQuality ManagementRisk ManagementLean Six SigmaChange Management

Senior Engineer

Sep 2010Mar 2012 · 1 yr 6 mos

  •  Client Engagements
  • Lead the Control and Instrumentation Engineering for for India’s 1st Integrated Solar module manufacturing facility (Polysilicon, Wafer, Cell and Module) to do Techno-Commercial Evaluations, Detail Engg, Vendor selection, vendor development.
  • Worked with Client to freeze Engineering requirements, build RFP/RFI, evaluate supplier’s bid and finalize contracts.
  • Applied design innovation and assisted procurement team in negotiation to save 20% of my scoped project budget.
  • Developed new suppliers and prepared supplier score card matrix for 20 packages of power and energy projects.
  • Selection, Detail Engineering and Configuration of Emerson Delta-V, Honeywell BMS and Rockwell’s PLC/SCADA.
  • Led detail engineering and safety studies to develop operation philosophy, control logic and SCADA guidelines.
  •  Control and Automation Engineering – Solar Thermal Power Plant
  • Built project concept engineering documents like scope matrix, work package list, layouts and operation philosophy.
  • Developed Specification for critical packages and evaluated supplier’s proposal of Turbine, DCS and Hydraulic system.
  •  Business development
  • Built technical project proposal to participate in public sector tenders.
  • Facilitated in-bid clarification and client engagement that led to successful qualification of bids in nuclear and Oil & Gas industry.
  • Achievements:
  • Received Letter of appreciation from Business Head for outstanding leadership and commitment - 2012.
  • Published and presented Technical paper at international conference ISA-2012, POWAT held at New Delhi.
Control EngineeringVendor ManagementProject Proposal DevelopmentTechnical Evaluations

Johnson matthey

Assistant Manager Instrumentation - Projects

Jun 2009Sep 2010 · 1 yr 3 mos · Kanpur

  •  Project Manager – Catalyst Expansion and Renovation Project
  • Led project team to complete project engineering, safety studies, planning, risk management and site Execution.
  • Prepared master budget and schedule and translated it into weekly work responsibility matrix to reduce variance.
  • Managed stake-holders, suppliers and contractors, and resolved conflicts at the site to run the project execution.
  • Used Lean Six Sigma and automation to redesign processes that streamlined operation and improved ergonomics.
  • Built RFP, conducted techno-commercial evaluation and negotiated with vendors to save 15% of project budget.
  • Implemented entire life cycle of Plant Automation: designing, configuration, testing, training and commissioning.
  • Conducted workshops to drive acceptance of automation among workers and operators to meet client’s satisfaction.
  •  Global Project Delivery – Two Greenfield Catalyst Manufacturing plants
  • Collaborated with UK Team to develop long-term global partnership with European and Indian suppliers.
  • Developed entire plant operation sequence, P&IDs, control philosophy, Cause and Effect Matrix and Layout.
  • Learned technologies at UK plants and built an advanced version of plant automation and SCADA using Emerson DCS.
  • Designed integration for sub-plant PLCs and main DCSs and created complete control possible from a single terminal
  • Set up IT infrastructure at Indian site that resolved business problem by providing global access to Indian plant.
  • Led cross-cultural international teams (20 people) to perform end to end integrated FAT at Germany and India
Project ManagementRisk ManagementLean Six SigmaPlant Automation

Sterlite technologies ltd.

Executive : Project Engineer

Jul 2007Jun 2009 · 1 yr 11 mos · Aurangabad, Maharashtra

  •  Operation Management – Site Manager for Green field Hydrogen Generation Plant
  • Prepared and monitored master schedule on MS project to minimize schedule and budget variation during execution.
  • Managed cross-functional teams (140 people) to complete installation, commissioning, testing and handing over.
  • Worked with Chinese engineers to re-configure the plant PLC, HMI and SCADA to meet the operational needs.
  • Ran operation to test performance parameters and mentored operation manager before contract closure.
  •  Pilot Scale plant – Site Execution
  • Designed plant control system and operation philosophy and applied lean methods to improve efficiency by 20%.
  • Honeywell DCS: Set-up the hardware, wrote code for controllers, designed SCADA and database, commissioning.
  • Led site team to complete the erection of the plant and conducted training sessions for operators and technicians.
  •  Process Improvement – Soaking Plant
  • Automated the existing bottleneck-Soaking Plant to increase its efficiency by 60% which increased line capacity.
  • Optimized RM consumption by redesigning the plant processes based on available patents and historical data.
Operation ManagementSite ManagementProcess ImprovementAutomation

Education

Indian School of Business

Jan 2013Jan 2014

Indian Institute of Technology, Kharagpur

B.Tech (Hons — Instrumentation Engineer (Electrical Department)

Jan 2003Jan 2007

Politecnico di Torino

Internship

Jan 2007Jan 2007

EPFL

Internship

Jan 2006Jan 2006

Vidya Bharti Chinmaya Vidyalaya

Higher Secondary — Bio-Science

Jan 2001Jan 2003

Stackforce found 100+ more professionals with Project Management & Business Development

Explore similar profiles based on matching skills and experience