ABHISHEK SINGH

Operations Associate

Gorakhpur, Uttar Pradesh, India10 yrs 4 mos experience
Most Likely To SwitchHighly Stable

Key Highlights

  • Over ten years of experience in railway electrification projects.
  • Expertise in OHE/PSI design and project management.
  • Proven track record in delivering projects on time and within budget.
Stackforce AI infers this person is a Railway Electrification Specialist with extensive experience in engineering design and project management.

Contact

Skills

Core Skills

Engineering DesignProject EngineeringProject Management

Other Skills

Analytical SkillsAutoCADBill of Quantities (BOQ)Business StrategyCommissioningComputer-Aided Design (CAD)Construction ManagementConstruction SafetyDesign EngineeringE&MEPCElectrical Design WorkElectrical EngineeringEngineeringEntrepreneurship

About

A result oriented professional with Ten years Experience in Engineering designs, Engineering consulting, Bid engineering, Project management, Project execution in Railways / Siding / Metro and Substations EPC projects. 1x25KV, 2x25KV OHE/PSI design Doubling ,Third-Fourth line & Modification in Railway Electrification Projects. Client RE core, Rail Vikas Nigam Ltd., Ircon International Ltd., Railway Construction, Powergrid Corporation India Ltd. • Currently associated with Tata Projects Ltd. as Deputy Manager- OHE/PSI Design Engineering. Projects completion Approx.2400 TKM Tender Cost. 1700Cr.approx. Key skills * 1x25KV, 2x25KV Assessment OHE /PSI Pre-bid Support to Tendering Team. * Preliminary & Detail Design Sectioning Diagrams,GPSD, Layout plan,CSD,SED, Earthing & Bonding, As Erected LOP, SED, SWS etc.) * Responsible for preparation and review of technical arrangement drawings for Overhead as per railway electrification standards like RDSO, Ensure accurate representation of masts, portals, cantilevers, wiring. * Perform quantity estimation for materials and components required for railway electrification projects. Conduct detailed surveys and measurements to validate designs and ensure feasibility. * Prepare BOQs (Bill of Quantities) and cost estimates while adhering to project specifications and standards. Coordinate with design, alignment, and site teams to verify and update quantities as needed * Substation design 132 Kv TSS on RDSO specifications, SLD, Erection key diagram, Structure layout, layouts & produces - Equipment layouts for outdoor switchyard, indoor substation, Cable trench, Cable run layouts, lighting, earthing & lightning protection layouts, Battery sizing. * Vendor technical evaluation and Bid Design review. * OHE/ PSI Material Assessment, BOQ estimation and Reconciliation. * Technical discussion, Interface and Co-ordination with customer and other Stakeholders. * Engineering Workload, Productivity analysis and Manhour Estimation for Projects.

Experience

Tata projects

4 roles

Deputy Manager

Aug 2024Present · 1 yr 7 mos

  • Ten Year's work Experience in 25 KV OHE/SWS SP,SSP & TSS Design, Material Assessment,
  • under North Western Railway Jodhpur Division RE Doubling Project from Phulera (Excl.) to Jodhpur (Excl.) Rajasthan. TKM-650.
  • Role & Responsibility:
  • Electrical Design Work
  • SLD,GPSD,Layout Plan (LOP),AED LOP,AED SED.
  • Cross Section Drg. (CSD).
  • Structure Erection Drg.(SED).
  • Track Bonding Plan.
  • Clearance study under ROB,FOB.
  • PSI Design Work:
  • Sectioning & Parelling Post (SP)
  • Sub Sectioning & Parelling Post (SSP)
  • 132 Kv Substation Design,SLD,Erection key diagram, layouts & produces - Equipment layouts for outdoor switchyard, indoor substation, trench/tray layouts, lighting, earthing & lightning protection layouts,Battery sizing
Engineering DesignDesign EngineeringMicrosoft ExcelBill of Quantities (BOQ)EPCRail Operations+5

Deputy Manager

Sep 2022Jul 2024 · 1 yr 10 mos

  • Nine Year's work Experience in 25 KV OHE/PSI Design, Material Assessment.
  • under RE Core Project from GKP-ANDN,ANDN-NTV,ANDN-SUBG,GD-BRK Gr.-304,Gr.-306, Uttar Pradesh
  • RKM-265,TKM-395
  • Client:RE Core , Lucknow Division
  • Role & Responsibility:
  • Electrical Design Work
  • SLD,GPSD,Layout Plan (LOP).
  • Cross Section Drg. (CSD).
  • Structure Erection Drg.(SED)
  • Track Bonding Plan.
  • Clearance study under ROB,FOB.
  • PSI Design Work:
  • Sectioning & Parelling Post (SP)
  • Sub Sectioning & Parelling Post (SSP)
  • 132 Kv TSS Design SLD,Erection key diagram, layouts & produces - Equipment layouts for outdoor switchyard, indoor substation, trench/tray layouts, lighting, earthing & lightning protection layouts,Battery sizing
Engineering DesignDesign EngineeringTeam LeadershipLeadershipBill of Quantities (BOQ)EPC+14

Deputy Manager

Apr 2022Aug 2022 · 4 mos

  • Seven Year's work Experience in , SWS SP,SSP & TSS Design, Material Assessment, Project Planning.
  • under PGCIL RE Doubling Project from Londa (Excl.) to Miraj (Excl.) Karnataka. TKM-450.
  • Client: Powergid Corporation of India Limited
  • Role & Responsibility:
  • Electrical Design Work
  • SLD,GPSD,Layout Plan (LOP).
  • Cross Section Drg. (CSD).
  • Structure Erection Drg.(SED)
  • Track Bonding Plan.
  • Clearance study under ROB,FOB.
  • PSI Design Work:
  • Sectioning & Parelling Post (SP)
  • Sub Sectioning & Parelling Post (SSP)
  • 132 Kv TSS Design SLD,Erection key diagram, layouts & produces - Equipment layouts for outdoor switchyard, indoor substation, trench/tray layouts, lighting, earthing & lightning protection layouts,Battery sizing.
Engineering DesignE&MDesign EngineeringTeam LeadershipMicrosoft ExcelBill of Quantities (BOQ)+15

Deputy Manager

Sep 2021Apr 2022 · 7 mos

  • IRCON INTERNATIONAL LIMITED
  • (A Govt. of India Undertaking) Ministry of Railways
  • ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT FOR THE WORK OF 25KV OHE Railway Electrification
  • "Design, Supply, Installation, Testing & Commissioning of Railway Electrification work for Hanumangarh Sriganganagar - Sarupsar - Suratgarh, Incl. Sarupsar Anupgarh, Madar - Pushkar, Degna - Ratangarh, Hisar- Suratpura Sections of North Western Railway (Package No.-1) on Engineering, Procurement and Construction (EPC) Mode" (RE NWR PACKAGE-1, EPC-2, Jaipur & Bikaner Division
Engineering DesignDesign EngineeringProject CoordinationCommissioningMicrosoft ExcelBill of Quantities (BOQ)+17

Montecarlo limited

Assistant Manager

Aug 2020Aug 2021 · 1 yr · Bhopal, Madhya Pradesh, India

  • Six Years work Experience in Indian Railway Electrification for RVNL Project.
  • 25 KV OHE Design,Supply,Erection,Testing & Commissioning for Bhopal Division & Kota Division Kota to Bina.
  • RVNL Doubling & Modification Project in Madhya Pradesh & Rajasthan.
  • 150TKM Project Value Approx.125Cr.
  • Under Rail Vikas Nigam limited .
  • Role & Responsibility:
  • Electrical Design Work
  • SLD,GPSD,Layout Plan (LOP).
  • Cross Section Drg. (CSD).
  • Structure Erection Drg.(SED)
  • Track Bonding Plan.
  • Clearance study under FTP,HF,ROB,FOB.
  • Microstation Design SP, SSP & 132 KV TSS
  • PSI Design Work:
  • Sectioning & Parelling Post.
  • Sub Sectioning & Parelling Post.
  • 132 KV Substation Design SLD,Erection key diagram, layouts & produces - Equipment layouts for outdoor switchyard, indoor substation, trench/tray layouts, lighting, earthing & lightning protection layouts,Battery sizing.
  • Administrative Work:
  • Project Planning, work Management & Scheduling.
  • Material Assessment.
  • Subcontractor Supervision.
  • Client Meeting & Coordination for Project Completion Before Time.
  • Business Development
Engineering DesignConstruction ManagementDesign EngineeringProject CoordinationCommissioningMicrosoft Excel+21

Angelique international limited

Project Engineer

Jul 2018Jul 2020 · 2 yrs · New Delhi Area, India

  • Five Year Two Month work Experience in Indian Railway Electrification Project For
  • 25 KV OHE Design,Supply,Erection,Testing & Commissioning of Kalianpur to Farukhabad (Uttar Pradesh).150TKM.Under NE Railway In Izzatnagar Division.Project Value Approx.70 Cr. Izzat Nagar division, Client :- IRCON International Ltd.
  • Third Line Railway Electrification Project 25 KV OHE, Design, Supply,Erection, Testing & Commissioning under Railway Construction Department 50RKM
  • Rajnandgaon- Paniajob (Chhattisgarh)
  • Nagpur Division.
  • Fourth line Railway electrification projects 25 kV OHE design in Bilaspur division under Railway construction department Belpahar to Raigarh, TKM-55, Projects cost-21 Crore.
  • Role & Responsibility:
  • Electrical Design Work
  • SLD,GPSD,Layout Plan (LOP).
  • Cross Section Drg. (CSD).
  • Structure Erection Drg.(SED)
  • Track Bonding Plan.
  • SWR Plan.
  • Clearance study under FTP,HF,ROB,FOB.
  • Microstation Design SP & SSP.
  • 132 KV TSS Design
  • Administrative Work:
  • Project Planning, work Management & Scheduling.
  • Material Assessment.
  • Subcontractor Supervision.
  • Client Meeting & Coordination for Project Completion Before Time.
  • Business Development
Engineering DesignConstruction ManagementDesign EngineeringProject CoordinationCommissioningMicrosoft Excel+14

Grupo cobra

Sr.Engineer

Jun 2015Jun 2018 · 3 yrs · Sambalpur, Odisha, India · Hybrid

  • Three Year work Experience in Indian Railway Electrification for 25 KV OHE Design,Supply,Erection,Testing & Commissioning of Gr.170A.417 TKM Jharsuguda (Excl) to Dungaripali ( Incl.)(Odisha) Under BBS Division ECOR.
  • Project Tender Value Approx 200 Cr.INR.
  • Siding Line of
  • Vedanta Aluminium & Power Ltd.
  • Bhushan Power & Steel Ltd.
  • Aryan Ispat & Power Ltd.
  • Role & Responsibility:
  • Electrical Design Work
  • Layout Plan (LOP).
  • Cross Section Drg. (CSD).
  • Structure Erection Drg.(SED)
  • Track Bonding Plan.
  • SWR Plan.
  • Clearance study under FTP,HF,ROB,FOB.
  • Microstation Design SP & SSP.
  • Civil Supervision:
  • 25 KV OHE Foundation.
  • Microstation Fdn.Upto 132 KV substation Fdn.Supervision.
  • Mast & Substation Structure Grouting.
  • OHE Planning & Supervision:
  • Mast & Boom Erection Manually.
  • Cantilever & SPS Erection.
  • Wiring Catenary & Contact wire.
  • D/C & C/W Erection.
  • Cantilever Adjustment.
  • SED & ATD Checking.
  • TWC.
  • SI Erection.
  • Administrative Work:
  • Project Planning, work Management & Scheduling.
  • Material Assessment.
  • Subcontractor Supervision & Billing.
  • Client Meeting & Coordination for Project Completion Before Time.
Engineering DesignConstruction ManagementDesign EngineeringProject CoordinationCommissioningMicrosoft Excel+19

Education

Dr. A.P.J. Abdul Kalam Technical University

Master of Business Administration - MBA — Finance and Financial Management Services

Jan 2017Jan 2019

BHABHA INSTITUTE OF TECHNOLOGY (KANPUR)

Bachelor of Technology (B.Tech) — Electronics and Communication Engineering

Jan 2011Jan 2015

Stackforce found 100+ more professionals with Engineering Design & Project Engineering

Explore similar profiles based on matching skills and experience