Audrey Bascoul, PhD

CEO

Austin, Texas, United States10 yrs 10 mos experience
Highly Stable

Key Highlights

  • PhD in Lean Construction with extensive research experience.
  • Led cross-functional teams in high-budget construction projects.
  • Pioneered new product development approaches in prefabrication.
Stackforce AI infers this person is a Construction Management expert with a focus on Lean methodologies and prefabrication.

Contact

Skills

Core Skills

Construction ManagementProject DeliveryProduct DevelopmentProject ManagementProduct Innovation

Other Skills

Budget ManagementRisk MitigationLive ProductionKey Performance IndicatorsCoordinate MeetingsOrganization SkillsProject Status ReportingRisk ManagementProgress MonitoringRetrofitNegotiationDocumentation ManagementOperational OptimizationPresentation SkillsMission Critical

Experience

10 yrs 10 mos
Total Experience
1 yr 5 mos
Average Tenure
10 mos
Current Experience

Fieldworks ai

CEO, Co-Founder

Jul 2025Present · 10 mos

Tesla

3 roles

Manager, Factory Layout Design

Dec 2022Jul 2025 · 2 yrs 7 mos

Sr. Technical Program Manager, Factory Layout Design

Mar 2022Dec 2022 · 9 mos

Sr. Technical Program Manager, Factory Engineering

Sep 2020Jun 2022 · 1 yr 9 mos

Katerra

2 roles

Strategic Program Manager, R&D

Promoted

Jun 2019Aug 2020 · 1 yr 2 mos

  • Katerra is a technology-driven offsite construction company that is breaking new ground by vertically integrating the construction supply chain and developing new technologies to optimize every aspect of building design, materials supply, and construction.
  • Steered the design of the company’s main building platform (prefabricated 24-unit garden-style apartment) 30% below market in 3 months using Target Value Design approach (equivalent to ‘Target Costing’)
  • Managed cross-functional team involving 13 disciplines to design new building platform, budget: 50M
  • Developed schedule, managed dependences, mitigated risk and delivered on time the building platform unique documentation set (e.g., permit set, factory shop drawings, field work instructions, fastening standards)

Strategic Project Manager, R&D

Sep 2018Jun 2019 · 9 mos

  • Pioneered the implementation of a company-specific new product development approach for 20+ new prefabricated assemblies
  • Developed schedules, monitored progress, mitigated risk, and reported weekly progress to the CTO on 8 R&D products (e.g., bath kit). Budget: $4M. Reduced new product development lead time by 20%
  • Led team to troubleshoot field implementation challenges of 25 new prefabricated assemblies on live construction projects. Provided feedback to engineers using DfX. Resulted in increase of “acceptance percentage” by the construction team of the new prefabricated assemblies from 40% to more than 70% at Pilot stage
Live ProductionKey Performance IndicatorsCoordinate MeetingsOrganization SkillsProject Status ReportingProduct Development+1

Dome construction

Sr. Project Engineer/Project Manager

Jan 2018Jul 2018 · 6 mos · San Francisco Bay Area

  • Managed a 35M tenant improvement project for a large tech company in Mountain View. Facilitated planning, using language-action during lookahead planning and daily huddles. Increased subs participation to lookahead planning (from 4 trades when initially involved, to 10).
  • Project-managed the exterior work (1.2 M), including: leveled quotes for subs selection, wrote and issued subcontracts, updated master schedule, negotiated change orders, managed project documentation.
  • Represented the company at the (biennial) Construction Research Congress in Louisiana, where I presented 2 research papers.
RetrofitOrganization SkillsProject Status ReportingProject ManagementConstruction Management

Berkeley lab

Construction Project Complexity - Graduate Student Researcher

Jan 2017Jan 2018 · 1 yr · Berkeley, CA, USA

  • Conducted research on project complexity in high-end facility upgrades as part of my PhD research, and helped the construction project team implement Lean Construction principles and methods on a cooling towers replacement project (10M).
  • Published 3 conference papers:
  • Bascoul, A., Tommelein, I., and Tuholski, S. (2018). "Construction project complexity as addressed in traditional vs. Lean project management literature." Construction Research Congress, New Orleans, LA, USA.
  • Bascoul, A., Tuholski, S., and Tommelein, I. (2018). "Lean Construction to manage project structural complexity: the LPDS-MDM framework." Construction Research Congress, New Orleans, LA, USA.
  • Bascoul, A., Tuholski, S., and Tommelein, I. (2017). "Use of DSM to capture unplanned design iterations on a facility plant upgrade project." 19th International DSM Conference, Espoo, Finland.

Uc berkeley college of engineering

Graduate Student Instructor

Aug 2016Dec 2016 · 4 mos · Berkeley

  • Was the teaching assistant for:
  • CE167 Engineering and Project Management (~100 students).
  • CE268A Lean Construction Concepts and Methods (~35 students).
  • Developed a teaching tool (memo cards) to help students memorize construction terminology and test their knowledge. It is a work in progress and the tool is accessible at: audreybascoul.com/taduties.html .

Ucsf

Research, Lean Project Delivery System

Jun 2016Aug 2016 · 2 mos · San Francisco Bay Area

  • Conducted research on UCSF's unique team selection process for IPD-like projects. Summarized findings in a white paper (unpublished).
  • Published a conference paper:
  • Bascoul, A.M., Tommelein, I.D., Tillmann, P., and Muxen, S. (2018). “Towards Facility Management Participation in Design: A UCSF Case Study.” In: Proc. 26th Annual Conference of the International. Group for Lean Construction, Chennai, India.

Dpr construction

Research Intern and Product Manager

Jun 2015May 2016 · 11 mos · San Francisco Bay Area

  • Fulfilled the role of product manager for a web application developed internally at DPR to deliver as-builts in a searchable database (vueops.com).
  • Conducted research for the San Francisco International Airport for process improvement in as-built search. Summarized results in a technical report.
  • Conducted internal study at DPR Construction to estimate cost of building turnover process, using discrete-event simulation.

Level 10 construction

Project Engineer Intern

Jun 2014Dec 2014 · 6 mos · Menlo Park

  • Worked on the construction of the Facebook West Campus (MPK20) in Menlo Park, CA (430,000 sq. ft. office building).
  • Reviewed submittals and Request for Information (RFIs), reported project progress.
  • Created a quality dashboard to correct defects.
  • Developed a program to automatically color 2D drawings to show subcontractors' daily space use. Used VBA in Excel. Published results in:
  • Bascoul, A. and Tommelein, I. (2017). "Visualizing daily on-site space use." In: Proc. Lean and Computing in Construction Congress (LC3), Vol. 3 (IGLC), Heraklion, Greece.

Education

University of California, Berkeley

Doctor of Philosophy - PhD — Lean Construction

Jan 2015Jan 2017

Arts et Métiers - École Nationale Supérieure d'Arts et Métiers

Master of Science – Engineer Title — Mechanical and Industrial Engineering

Jan 2011Jan 2014

Lycee Prive Sainte Genevieve (Ginette)

Mathematics and Physics

University of California, Berkeley

Master of Science — Civil and Environmental Engineering

Stackforce found 100+ more professionals with Construction Management & Project Delivery

Explore similar profiles based on matching skills and experience