M

Muhammad Faisal Siddiqui

Project Manager

United Arab Emirates17 yrs 11 mos experience
Most Likely To SwitchHighly Stable

Key Highlights

  • 14 years of project management experience in oil and gas.
  • Expert in refinery and chemical plant operations.
  • Skilled in project control and technical understanding.
Stackforce AI infers this person is a Project Management Specialist in the Oil and Gas industry.

Contact

Skills

Core Skills

Project ControlTechnical Understanding

Other Skills

CommunicationContractualAttention to DetailChange OrdersResource PlanningSkilled Multi-taskerInspectionEquipmentsPlanningEngineeringMaterialsTestingRisk AssessmentSupervisory SkillsCommissioning

About

14 years of oil and gas sector project management and maintenance experience in Pakistan and middle east. Hand on experience of inspection, refurbishment, QA/QC, piping, pipe line construction and tank construction, Pre-commissioning, and system hand over in petroleum refinery, chemical and gas processing plant.

Experience

17 yrs 11 mos
Total Experience
5 yrs 11 mos
Average Tenure
14 yrs
Current Experience

Descon engineering limited

8 roles

Sr. Engineer

Mar 2016Present · 10 yrs 2 mos

  • Working as senior engineer in construction division
CommunicationContractualTechnical UnderstandingProject ControlAttention to DetailChange Orders

Sr. Engineer (ENOC Oil Refinery)

Promoted

Oct 2015Present · 10 yrs 7 mos

  • Worked as lead engineer in ENOC Refinery TA 2016
CommunicationContractualTechnical UnderstandingProject ControlChange Orders

Sr. Engineer (ADCO North East Bab)

Sep 2015Oct 2015 · 1 mo

  • Worked as Area Incharge in Gas Train of ADCO North East Bab Shut Down 2015.
CommunicationContractualTechnical UnderstandingProject ControlChange Orders

Sr. Engineer (Baraka Power Plant 5600MW)

Jul 2015Sep 2015 · 2 mos

  • Worked as Sr. Engineer for the construction of auxiliary Boiler, Hold up and Reactor make up tanks along with installation of Sea Water by Pass pumps installation along with sea water intake channel gates, trash screen installation.
CommunicationTechnical UnderstandingProject ControlChange Orders

Sr. Engineer (Qatar Petroleum Refinery)

Mar 2015Jun 2015 · 3 mos

  • Maintenance Engineer at Qatar Refinery shut down 2015.
CommunicationContractualTechnical UnderstandingProject ControlChange Orders

Sr. Engineer (Qatar Chemical Company Limited)

Sep 2014Feb 2015 · 5 mos

  • Qatar Chemical II Brown Field project:
  • Replacement of Caustic wash settler vessel and scrubber with CC8800 DEMAG during 2015 annual turn around.
  • Caustic vessel will be replaced with new vessel along with its auxiliary scrubber, piping and structure which will be dismantled and later after replacement of vessel will be re-installed.
CommunicationContractualTechnical UnderstandingProject ControlChange Orders

Lead Engineer (Qatar Gas Plateau Maintenance Project)

Promoted

Oct 2013Sep 2014 · 11 mos

  • QG-1 Green and Brown field system wise handing over of trains, AGR, TGT, Absorber, Sour water and utility area.
  • PMC activities of gassing, degassing, de-greasing, and dry out for RFSU.
  • Closing of discipline and system punch list for handing over of systems.
CommunicationContractualTechnical UnderstandingProject Control

Sr. Engineer (Qatar Gas Plateau Maintenance Project)

Dec 2011Oct 2013 · 1 yr 10 mos

  • Qatargas is the largest LNG producing company in the world, with an annual LNG production capacity of 77 million ton per annum (MTA). Qatargas signed an Engineering, Procurement and Construction (EPC) contract with TCJV, a joint venture between Technip and Chiyoda, to ensure that the production capacity of Qatar gas is maintained well into the future. The Plateau Maintenance Project (PMP) has been initiated to meet the need for increased feed gas rates from offshore wells and to augment onshore plant processing facilities in order to handle the additional volumes.
CommunicationContractualTechnical UnderstandingProject Control

Byco oil pakistan limited (115k bpd oil refinery construction, start up project)

2 roles

Construction Engineer

Jun 2010Dec 2011 · 1 yr 6 mos

  • Construction of 115K bpd Oil Refinery
Technical Understanding

Inspection Engineer

Dec 2008May 2010 · 1 yr 5 mos

  • Refurbishment of Static Equipment and Piping of CRU, VDU, DHT, NHT, Amine, Platformate, Iso-merization, Gas Plant.
Technical Understanding

Ootcl

Mechanical Project Engineer

Dec 2007Dec 2008 · 1 yr · Karachi

  • Construction of Oil terminal (7 nos. tanks dia. ranging from 24 to 47 meter with fixed roof) and laying associated piping

Education

NED University of Engineering and Technology

Master of Engineering Managment — Engineering management

Jan 2010Jan 2011

NED University of Engineering and Technology

Bachelor of Engineering (BEng) — Mechanical

Jan 2004Jan 2007

ADAMJEE GOVT.SCIENCE COLLEGE KARACHI

H.S.S.C (Pre-Engineering) — Engineering

Jan 2001Jan 2003

NASRA SECONDARY SCHOOL

S.S.C KArachi — Biology and Chemistry

Jan 1992Jan 2001

Stackforce found 100+ more professionals with Project Control & Technical Understanding

Explore similar profiles based on matching skills and experience