Pratyush kumar

Consultant

North Delhi, Delhi, India6 yrs 4 mos experience
Most Likely To SwitchAI Enabled

Key Highlights

  • Delivered over $100M in value through supply chain transformation.
  • Achieved $30M in savings via logistics optimization.
  • Developed data-driven tools improving defect analysis in manufacturing.
Stackforce AI infers this person is a Supply Chain and Data Analytics professional with a strong background in Manufacturing.

Contact

Skills

Core Skills

Supply Chain ManagementCost OptimizationData AnalyticsQuality ManagementData VisualizationData ManagementManufacturing Engineering

Other Skills

AlteryCollaborationCost RationalizationCost SavingsCost TransformationCost to ServeDashboardDashboard DesignData AnalysisData IntegrationDefect AnalysisGenAIGenAI EnablementIndirect Cost OptimizationIndustry 4.0

Experience

Accenture

2 roles

Management Consultant

Promoted

Jun 2024Present · 1 yr 9 mos · Hybrid

  • Driving large-scale cost transformation, operating model redesign, and sourcing optimization for global Oil & Gas, CPG, Retail, and Chemicals clients.
  • Supply Chain Transformation: Delivered $100M+ in identified value and $30M in realized savings by redesigning logistics operations, optimizing truck utilization, and centralizing S&OP–logistics planning. Led network redesign of 450+ nodes and 900+ fleet right-sizing initiatives, achieving 8–10% cost savings.
  • Strategic Sourcing: Managed $400M+ spend analysis and Source-to-Contract assessments, delivering 5–8% cost reduction through supplier rationalization, negotiation packs, and process automation across logistics, MRO, and indirect categories.
  • Cost to Serve & Portfolio Rationalization: Designed CTS models for SKU/customer segmentation (~45K SKUs), improving margin by 4–6% via rationalization and pricing strategies.
  • Indirect Cost Optimization: Achieved $25M+ in savings through warehouse TCO modeling, manpower optimization, and marketing cost rationalization across healthcare, retail, and CPG clients.
  • Spend Analytics & GenAI Enablement: Implemented GenAI-enabled spend cube visibility for ~$10B global spend, reducing analysis turnaround by 60% and enabling actionable insights through benchmarking and performance dashboards
Cost TransformationOperating Model RedesignSourcing OptimizationSupply Chain TransformationStrategic SourcingCost to Serve+6

Management Consultant Analyst

Sep 2021May 2024 · 2 yrs 8 mos · Hybrid

Paytm

Growth Manager

Jul 2021Sep 2021 · 2 mos · Noida, Uttar Pradesh, India

Accenture strategy

Management Consultant Analyst

Apr 2020Jun 2020 · 2 mos · Gurgaon, Haryana

Jindal stainless

2 roles

Associate Manager

Jul 2017Jun 2019 · 1 yr 11 mos · Hisar Area, India

  • Empowered with a diverse set of job profile ranging from IT & Analytics with involvement in Industry 4.0 project in JSL Jajpur, to working with Quality/Assurance and R & D teams developing meaningful metallurgical insights, thus giving a holistic overview.
  • Major Projects -
  • > Developed a data-driven defect analysis tool which aims to develop insights for important variables causing a particular defect
  • > Jointly worked in collaboration with Quality and R&D team, with a major breakthrough in
  • uncovering the parameters responsible of defects such as Pin-holes and dishing in JBS (Jindal Blade
  • Steel, a flagship product of JSHL) leading to a reduction in the defect percentage.
  • > Alongside I also analyzed the major defect such as cracked edge (in grades such as 204 Cu &
  • 430-RF3) and sliver defects (in major grades such as 304, JSLU-DD and JSLU-SD) with a significant
  • reduction in defect.
  • Other Initiatives & Involvements -
  • > Designed Tableau based dashboards for Head of Departments, to keeping track of their daily report
  • > Involved in the data integration of each workstation to create a central repository of master data for the plant
Data AnalysisIndustry 4.0Quality AssuranceR&DData AnalyticsQuality Management

Summer Internship

May 2016Jul 2016 · 2 mos · Hisar Area, India

  • Analysis of patch welding between two coils of ferritic grades (409L, 409M & 430). Prime concern was the elimination of patches to join two coil during welding, thus improving the productivity.
  • > Provided a solution, by tempering the welded area. This saved the time by about 10 mins per coil production; Overall time saving by 1 Hr 30 mins/day.
  • > Feasible ideas provided for tempering of the welded joints such as infrared heating, induction heating and laser heating, with minimum return on investment within 16 months.

Texmaco rail & engineering ltd

Summer Trainee

May 2015Jun 2015 · 1 mo · Kolkata Area, India

  • Practical exposure of studying the challenges in various metal forming process and the deformation associated with these forming process. Along with this an overall study of micro-structure and mechanical properties after resistance seam and resistance spot welding.

Education

Faculty of Management Studies - University of Delhi

Master of Business Administration - MBA

Jan 2019Jan 2021

Indian Institute of Technology, Roorkee

Bachelor of Technology - BTech — Metallurgical Engineering

Jan 2013Jan 2017

Army Public School Barrackpore

12th — Science

Jan 2011Jan 2012

St. Xavier's Institution

10th — Science

Jan 2005Jan 2010

Stackforce found 100+ more professionals with Supply Chain Management & Cost Optimization

Explore similar profiles based on matching skills and experience