Krishna Mohan

Business Development Executive

Satna, Madhya Pradesh, India11 yrs 10 mos experience
Most Likely To Switch

Key Highlights

  • Over 10 years of experience in renewable energy projects.
  • Expertise in managing large-scale solar and wind projects.
  • Strong background in project management and engineering.
Stackforce AI infers this person is a Renewable Energy Project Manager with extensive experience in solar and wind energy sectors.

Contact

Skills

Core Skills

Renewable EnergyProject ManagementScadaWind EnergySolar PowerInstrumentation

Other Skills

Director levelDirect SalesBusiness StrategyPower ForecastingSchedulingAsset ManagementWind TurbinesEnvironmental StandardsSolar Systems DesignElectrical EngineeringProject ExecutionControl SystemsTesting and CommissioningExecutive TeamSales Management

About

Solar Power Plant EPC Projects & Operation Maintinance 1000 MW totally work completed Manager Work with the engineering team to conduct site investigation and assess the technical feasibility of developing a specific solar PV project.  Draft the scope of work and estimate the respective project budget.  Create and distribute RFPs to potential EPC subcontractors, establish evaluation metrics, and select winning proposals.  Manage contract negotiations, change orders, and other agreements with EPC subcontractors and vendors, and oversee all subcontractors’ work in all phases.  Develop and maintain project timeline, identify critical path and key milestones for project’s success.  Communicate with utilities and authority having jurisdictions regarding interconnection, permitting, and other regulatory compliance issues.  Identify the sources of likely problems and proactively take preventive measures to avoid any potential project risks, and determine response actions to mitigate any negative impact.  Possess strong organizational and time management skills. Wind Power Plant India Karnatka 1200 MW Projects & Operation Maintinance Wind Energy Convertion focus on hardware design turbines, rotor blades, electrical systems, and energy production systems. They analyze the aerodynamic properties of new designs, run tests, and document test results. Some oversee the manufacturing and testing of components. Preparing, scheduling, coordinating, and monitoring of assigned engineering projects. Interacting with clients, interpreting their needs and requirements, and representing them in the field. Performing quality control tasks on budgets, schedules, plans, and personnel performance and reporting on the project's status. Thermal power Plant 2640 MW Operation Maintinace Control Instruments Engineer Keep monitoring all the process parameters of the BTG Equipment health monitoring which involves vibration checks, Lubrication, sealing, temperature checks etc. Equipment repairs and overhaul. Inventory management and optimization. Outage/shutdown scheduling and planning. Safe working assesment including JSA(Job safety analysis) and HIRA(Hazard identification and Risk assesment). GMP Calibration Pharmacutical company Instrument Calibration post - Calibration Engineer Perform accurate calibrations. Organise service schedules. Record calibrations performed on equipment. Troubleshoot. Comply with customer requests. Calibrate in multiple parameters in line with equipment use. Cement Plant Griending unit Bhilai, GET Instrument enegineer

Experience

11 yrs 10 mos
Total Experience
2 yrs 4 mos
Average Tenure
2 yrs 11 mos
Current Experience

Ugrarupa energy private limited

Excutive

Jun 2023Present · 2 yrs 11 mos · Satna, Madhya Pradesh, India · Remote

Renewable EnergyDirector levelDirect SalesBusiness StrategySolar PowerProject Management

Tuv rheinland (india)

Quality Assurance Quality Control

Nov 2020May 2023 · 2 yrs 6 mos · Vadodara, Gujarat, India · Remote

Shri keshav cement (shri krishna solar)

Assistant Manager

May 2019Nov 2020 · 1 yr 6 mos · Koppal, Karnataka, India

  • ( SCADA ENGINEER ) Asst. Manager _ 6 Yrs. Exp_ Renewable Energy _ Power Forecasting & Scheduling _ Techno Commercial_ Onshore Wind _ Asset Management _ Electrical Site Engineer _ Balance of Plant _ Central Remote Monitoring (SCADA) _ SAP PM _ SAP End User _ MIS Reporting
  • Preparing, scheduling, coordinating and monitoring the assigned engineering projects. Monitoring compliance to applicable codes, practices, QA/QC policies, performance standards and specifications
  • Keep an eye on all relevant safety objectives and legal requirements.
  • Interpret clients' requirements.
  • Identify engineering problems and ensure solutions are implemented.
  • Evaluate, organise and prioritise workload within a schedule.
  • a) In-charge of the overall planning and control of the project.
  • b) Ensures that materials and workmanship are at all times in accordance with plans and specifications.

Enercon

Engineer

May 2017May 2019 · 2 yrs · Daman, Daman and Diu, India

  • Project 1000 MW , Wind turbine , Karnatka , Gujrat, Tamilnadu , Rajasthan , Madhya pradesh
  • Analysing the best locations for sites Researching and designing new windfarms
  • Overseeing production programmes for new sites
  • Managing technicians and site workers Designing and selecting suitable equipment
  • Ensuring projects meet environmental standards
  • Carrying out cost-efficient, productive processes in line with budgets Doing tests in a laboratory
  • Liaising with geologists, geophysicists and specialist contractors Working in a power station, office, or laboratory.

Larsen & toubro

Solar Engineer

Sep 2014May 2017 · 2 yrs 8 mos · Madurai, Tamil Nadu, India

  • 25 MW + 50 MW operational level understanding of the requirement of the client/customer, Site Visits, Site feasibility & Solar Systems Design and complete execution.
  • Able to check site feasibility and provide the best suitable option for enhancing suitability.
  • Designing of arrangements of the solar panels for Rooftop & Ground Mounted & other various supported Electrical equipments & selection of cables for plant including layouts & schematic diagrams and calculation of technical Sizing, BOQ/BOM.
  • Drawing/Document submission/approvals, scheduling,
  • Factory inspections, proving the guaranteed prepared a generalized check list for review of all standard.
  • End to end execution of solar projects (Rooftop & Ground Mounted) and AMC / Service Support.
  • Designing the simulations must have expertise on software like STAAD-PRO, Solid works, etc. and similar simulators and expertise in AutoCAD and related designing tools.
  • Having knowledge of IS & specifications needed for the designing and execution of solar projects.
  • & PV SYST or similar software and should have good knowledge for conducting all essential tests required in entire Solar Project Execution.
  • Maintaining of files and documents as back-up for estimate figures, including current (accurate) information on prices from suppliers through direct contact, sales brochures,

Lalitpur power generation company limited

Instrumentation and Control Engineer

Jun 2014Jan 2017 · 2 yrs 7 mos · Lalitpur Area, India

  • Turbine control system testing, tweaking and commissioning
  • Plant DCS system (Boiler and BOP) testing, tweaking and commissioning
  • Plant SCADA system (electrical switchgear control) testing and commissioning
  • All the above work involves more or less the same type of work
  • Testing (occasional calibration and replacement) of Plant field instrumentation
  • Testing and commissioning of plant control valves (loop checking and ensuring proper feedback)
  • Testing commissioning of plant solenoid valves (proper operation and feedback
  • Testing and commissioning of plant MOV (with electrical engineer, this by far in my opinion is the most back breaking work and in the quest of complete automation there are literally 50-100 MOV’s in each co generation plant, i don’t know MOV’s and me do not go well )
  • Testing and commissioning of plant servo’s (a very subtle art :slight_smile: )
  • Testing and calibration of plant measurement circuits, pressure, temperature, flow, speed, position and vibration probes. They also take a lot of time mainly because they form a major quantity of the plant instrumentation.
  • Testing and commissioning of plant analyzers, In boilers, it will be PH, silica, conductivity, phosphate, SOx, NOx, CO, unburnt fuel and oxygen analysers. This work as far as i have seen is exclusively done by the vendors.
  • Testing and tweaking of graphics, minor modifications in consultation with plant operating personnel.
  • testing and tweaking of control constants and minor (to sometimes major) logic modifications in application code to the controllers.
  • hanging around a lot of time in marshaling units, RTU’s, in the field and in front of the controller, thinking, scratching your head and desperately wising to god that atleast this should work.
  • Testing and commissioning of other plant systems, which do not form the part of the typical turbine and DCS control. They include
  • Turbine and generator CO2 release system
  • Plant and Trubine heat sensors and fire detectors panel

Education

Rajiv Gandhi Prodyogiki Vishwavidyalaya

Bachelor of Engineering - BE

Aug 2011Jan 2015

Gandhi Institute of Management Studies (GIMS), Gunupur

Master of Business Administration - MBA — Energy & Project Management

Jan 2018Jan 2020

sindhu her. secondry school satna

Jan 2006Jan 2009

Stackforce found 100+ more professionals with Renewable Energy & Project Management

Explore similar profiles based on matching skills and experience