Yogesh K.

CEO

Gurugram, Haryana, India29 yrs 8 mos experience
Highly Stable

Key Highlights

  • Over 25 years of experience in operations management.
  • Expert in driving manufacturing excellence and cost reduction.
  • Proven track record in leading large cross-functional teams.
Stackforce AI infers this person is a seasoned leader in the automotive manufacturing industry with a focus on operational excellence.

Contact

Skills

Core Skills

Operations ManagementManufacturing EngineeringQuality ManagementManufacturing Operations ManagementProject Management

Other Skills

5SAPQPAutomobileAutomotiveBenchmarkingBudget ManagementBudget preparationBudgetingBusiness DevelopmentBusiness ManagementBusiness PlanningBusiness Process ImprovementBusiness StrategyCapaxCapital & Expense Budget Management

About

A dynamic professional with 25+ yrs. experience in Operations Mgt., Multi plant Operations, P&L, Budget Mgt. Plant cost control, EBIT Improvement, Quality, Manufacturing excellence, Manufacturing Engg, Material Mgt., Process Planning, Team development and High volume with large team handling in Automotive/Auto Component industries. • Adroit in managing overall Operations/Manufacturing, Industrial Engineering and Process activities in Plant to enhancing the operational efficiency, eliminating wastages, and achieving cost reduction through continuous improvement. • Specialization in developing & sustaining high performing teams, driving business excellence & delivering excellent financial results. • An enterprising leader with excellent communication, analytical, problem solving and man management skills. • Manufacturing, Material flow Planning experience with Zero defects, Zero losses and Zero Accident by optimization of Resources. • Experience in Greenfield/Brownfield/SKD/CKD project Production, Process, Quality, Workforce planning and Mgt. (two- wheelers and four-wheeler automotive OEM, Yamaha Motor, Maruti Suzuki and Ford Motor India). • Attitude towards change adaptability & result orientation in the challenging economic scenarios. • Demonstrated expertise in Process planning, Schedule Adherence, Time and Work Study (Productivity), Variable conversion Cost, Fixed Cost, Inventory Control, Visual Management, and Training & Development. • Adept in managing production-engineering operations involving design & development of processes new product development activities, streamlining processes / procedures to facilitate smooth production process.

Experience

29 yrs 8 mos
Total Experience
6 yrs 11 mos
Average Tenure
1 yr 9 mos
Current Experience

Ti automotive

Managing Director

Sep 2024Present · 1 yr 9 mos · India · On-site

  • Leading India Operations for TI Automotive India (Bundy India Ltd. and Hanil Tube India)

Yazaki india private limited

2 roles

Regional Head (Multi plant operation)

Promoted

Jan 2024Aug 2024 · 7 mos · On-site

  • Achievement-oriented professional with over 25+ years of experience in Multi Plant Operations, Manufacturing, Quality, Resource optimization, Value chain and People Management.
  • Directing productive cross-functional teams (Production, PPC, QA, SCM, Design, Mfg. Engg. Maint, Safety HR & Admin) with interactive and motivational leadership that spurs workforce of over 2300 workers and over 165 staff members to willingly give excellent results
  • Strategizing the long term business directions to ensure maximum profitability in line with organizational objectives. Cascading Organization Goals into Functional & Individual objectives.
  • Key focus on top line & bottom line profitability by sustaining optimal utilization of resources. Equal priority and adherence given to Safety & Legal compliances.
  • Prepare annual capital budget, revenue/expenditure budget considering future business plan and market conditions.
  • Experience of working in Japanese MNC and doing business with Japanese (Honda and Maruti), American (Ford), Indian customer (TML).
Multi Plant OperationsManufacturingQualityResource optimizationValue chainPeople Management+4

Plant Head

Feb 2022Jan 2024 · 1 yr 11 mos · On-site

  • Lead the Plant operations and transformed plant into profit making plant

Ford motor company

2 roles

Manager Manufacturing Engg. and Quality Vehicle Operations

Promoted

Mar 2017Jan 2022 · 4 yrs 10 mos

  •  Leading final assembly (TCF) operations at Ford India green field project at Sanand Ahmedabad
  • Gujarat, responsible for setting up organization structure, Workforce planning, process, facility
  • planning, installation and product launch in new plant, also responsible for quality organization
  • and team building.
  •  Department A3, MS, WP and scorecard development and control (Aligned with company business
  • objective) to achieve key matrix for SQCDPME indicator in process Quality, control mapping,
  • Control plan implementation.
  •  Driving approach “Quality must incorporation in manufacturing process”.
  •  Ford Production system implementation in Final Assembly (TCF) Sanand plant.
  •  Develop Production Plans and execution: MP1, Ramp-up & Productivity Improvement Roadmap.
  •  Leading Budget preparation and control including cost champion role to optimization of energy,
  • water, air, fuels and fluids.
  •  Leading Material Flow for Kitting and Sequencing from part receiving to point of fit considering
  • “Single piece flow”
  •  In addition, aligned material supply as per BOM and process flow and reduction in lead-time.
  •  Leading the strategy “Right part at right Qty. at right time at right place”.
  •  Resp. for Maintenance Planning for equipment up-time and resource planning.
Final assembly operationsWorkforce planningQuality organizationBudget preparationMaterial flowManufacturing Engineering+1

Manufacturing Operations Manager

Aug 2013Feb 2017 · 3 yrs 6 mos

  • Manufacturing lead for Vehicle Assembly operations

Maruti suzuki india limited

Production Mgr. ( Vehicle Assembly, TCF)

Feb 2006Aug 2013 · 7 yrs 6 mos · Manesar Gurgaon

  • Handle a team of 52 Engineers and 850 Operators. In Assembly Shop. (For two shift operation management)
  • Lead role in TCF for equipment validation, process and material flow planning, workforce deployment and quality system implementation in green field project (Manesar plant).
  • Working to achieve the targets set as per PQCDSM requirement to achieve the company goals.
  • Execution of Plan in an efficient manner whereby ensuring minimum loss on Final assembly, 100 % LOR. Achievement daily, weekly achievement review.
  • Develop and control system for effective management of 4M & control indices.
  • New model preparation - Planning for training, Tool availability, one cycle preparation, and responsible for smooth and hassle free operations during trails. Reporting of problems and assurance of countermeasures before mass production.
  • Assurance of smooth change point implementation. Carry out FMEA studies to ensure smooth execution.
  • Helping Team in implementing Kaizen / Poke Yoke, which eventually results in value addition of the shop.
  • Delegation and Distribution of work among the core group, effective empowerment of workforce so that resources are utilize judiciously.
  • Acting as a cohesive force to inculcate the feeling of Team Work, among the work force, Continuous appreciates and motivation of the work force.
  • Process improvement. (Quality, Productivity improvement and Waste Elimination).
  • Root cause analysis, implementation of C`measure, Poka-Yoke for defect prevention.
  • (Not to produce, not to flow and not to reoccur)
  • Losses, cost analysis and take C`measure to reduce (Manpower, Consumable, Scrap, Power and Rework)..
  • Done improvement through PDCA Cycle, Kaizen and Small Group Activity.
  • Material flow planning as per “Bill of process” considering material complexity and error proofing.
  • Part of Maruti Ciaz car project design team for “Design for Manufacturing” achieved the production target dates for the launch of the vehicle.

Yamaha motor co., ltd.

Sr.Engineer (Engine Assembly)

Jul 1996Feb 2006 · 9 yrs 7 mos · Greater Noida

  • Handle 50 Operators. & four Group Leaders on shop floor.
  • Prod. Planning co-ordination with P.P.C.in Engine Assembly.
  • Developed “ZERO DEFECT PROCESS” on various line speeds. (2 Stroke & 4 Stroke both Assy. lines).
  • Maintain 5S, DANDORI, 3R, Q.C.P.C. and 5-TEI activity.
  • To improve TSPR, ASPR, and Productivity (P.Q.C.D.S.M).
  • Losses & cost analysis and countermeasure to reduce (Manpower, Consumable, Scrap, Power and Rework).
  • ISO-14001 and TPM activity implementation as co-coordinator of Engine assy.
Team managementProcess improvementQuality system implementationMaterial flow planningManufacturing Operations ManagementQuality Management

Education

Gandhi Polytechnic

Engineering Diploma — Mechanical Engineering

Jan 1992Jan 1995

AOTS Oshaka Japan

Japanese Quality and Productivity systems

Jan 2006Jan 2006

Stackforce found 100+ more professionals with Operations Management & Manufacturing Engineering

Explore similar profiles based on matching skills and experience