Nishant Srivastava

CEO

South Delhi, Delhi, India22 yrs 1 mo experience
Most Likely To SwitchHighly Stable

Key Highlights

  • Led projects exceeding ₹2000 Crores in budget.
  • Achieved >99% customer satisfaction ratings.
  • Trained over 1000 engineers in best practices.
Stackforce AI infers this person is a leader in the energy sector with expertise in project management and engineering innovation.

Contact

Skills

Core Skills

Operational EfficiencyCustomer Relationship Management (crm)Technology ImplementationQuality AssuranceProcess ImprovementStrategic PlanningProject EngineeringEngineering CoordinationProject ManagementClient CoordinationProject PlanningErectionSteel StructuresNuclear Power PlantsFabricationProject Coordination

Other Skills

Team LeadershipFinancial ManagementTraining & DevelopmentResource ManagementDriving ResultsCustomer-Focused ServiceOperations ManagementProblem SolvingCommunicationStakeholder ManagementOperational ExcellenceConflict ResolutionTime ManagementInterpersonal CommunicationCustomer Service

About

🔍 Exploring the Power of Engineering Innovation: A Story of Transformative Leadership As a seasoned leader in the realm of power distribution, I've dedicated my career to driving transformative change and innovation in the engineering landscape. With a track record of spearheading high-impact projects and initiatives, I've consistently pushed the boundaries of what's possible in our industry. 🚀 Leading with Vision and Impact From my early days as a Graduate Engineer Trainee to my current role as an Asst. Vice President, I've always strived to lead by example and inspire those around me. By leveraging cutting-edge technology and strategic vision, I've orchestrated projects with budgets exceeding ₹2000 Crores, setting new benchmarks and achieving world-class results. 🏆 Recognized Excellence and Achievements Throughout my journey, I've been honored with numerous awards and accolades, including recognition for my contributions to quality improvement initiatives and groundbreaking projects that have set industry standards. Notably, I had the privilege of working on a project that clinched a prestigious world record, showcasing our team's dedication to excellence. 💼 Driving Innovation and Optimization At the heart of my work lies a passion for innovation and optimization. In my role as Circle Head for the Meter Management Group (MMG), I led a team in managing over 540 Cr of Annual Billing, achieving exceptional collection efficiency and customer satisfaction ratings of >99%. Through strategic initiatives like the launch of India's First Meter-Live App, I've driven company-wide automation, streamlining processes and enhancing efficiency. 🌟 Empowering the Next Generation of Engineers Having navigated complex transitions in my own career, I’ve developed a deep interest in helping young and mid-career professionals gain clarity, direction and structure in their growth journeys. Through my posts and practical insights, I share the same principles that guided me: Clarity-first thinking, Structured decision-making and a simple GPS-like approach to evaluating one’s growth path. My aim is to help professionals understand where they stand, where they want to go and how they can move forward with confidence. 🤝 Let's Connect If you’re passionate about engineering innovation or interested in gaining more clarity and direction in your professional journey, feel free to connect. I regularly share insights that help professionals think clearly, evaluate their options better and move forward with structured confidence. Always open to meaningful conversations!

Experience

22 yrs 1 mo
Total Experience
4 yrs 5 mos
Average Tenure
13 yrs 4 mos
Current Experience

Bses delhi

4 roles

Assistant Vice President

Promoted

Apr 2021Present · 5 yrs 1 mo · New Delhi, Delhi, India

  • Achieved an exceptional 100.64% Collection Efficiency by managing over ₹540 Crore of Annual Billing in BSES's largest and most challenging divisions. Attained 99% Annual Meter Download, while conducting 100+ on-site meetings as Division Head of KCC Billing.
  • (I) Profile: Division Head – KCC Billing (Mundka-Nangloi-Punjabi Bagh)
  • 1. Spearheading Critical Divisions of KCC (Key Consumer Cell) Dept. with a Key Consumer Base of over 2300, Annual Billed Units of around 400 MU & Annual Billed Amount of over ₹540 Crores
  • 2. Achieved Annual Collection Efficiency of 100.64%
  • 3. Achieved Annual Meter Download Percentage of over 99% resulting in the elimination of Human Intervention in Billing to avoid mistakes
  • 4. Ensured resolution of 100% of Provisional Billing Cases benefitting both the Company & the Consumer
  • 5. Ensured Customer Satisfaction by resolving 100% of Consumer Complaints received through various mediums
  • 6. Conducted 100+ on-site meetings with RWA’s, Industrial Associations & Consumers across 3 Divisions
  • 7. Trained KCC In-house teams with the Best Practices
  • (II) Profile: Head Business (Saket)
  • 1. Led BRPL's largest & vital Saket Division with an area of approx. 114 sq km, Consumer Base (SLCC & MLCC) of around 2 lakh, daily New Connection applications of over 200 cases & a staff of over 150 people
  • 2. Resolved over 3000 New Connection complaints pending due to various reasons
  • 3. Developed a Central Pool of CF & TF Engineers (in coordination with Central BET team) for the resolution of pending cases with the help of other underloaded divisions
  • 4. Achieved a collection efficiency of over 100% and exceeded the previous year's collection targets by 25 Lacs
  • 5. Improved Customer Satisfaction through the resolution of multiple new connection and other complaints
  • 6. Initiated 20+ Customer Engagement Programs & Ensured Positive engagement with Bureaucrats, Politicians, RWAs, Key Consumers and other Organizational bodies
Team LeadershipFinancial ManagementOperational EfficiencyCustomer Relationship Management (CRM)Training & DevelopmentResource Management+11

General Manager

Apr 2017Mar 2021 · 3 yrs 11 mos · New Delhi, Delhi, India

  • Led a team of 200+, Reduced Annual Budget by ₹10 Crore, Launched India's first Meter-Live App, driving the company’s automation, and achieved >99% customer satisfaction. Saved ₹1.5 Crore through Material Reuse & contributed to significant Loss Reduction.
  • (I) Profile: Circle Head (South) – Meter Management Group (MMG)
  • 1. Led a team of 50 Executives and 150 Front End Manpower
  • 2. Reduced Annual MMG Budget by 10% (₹10 Crore) for 3 consecutive years despite a 10% increase in the consumer base
  • 3. Launched India’s first Meter-Live Application for On-Site data capture, Automating Metering Jobs with Real-Time SAP updates
  • 4. Reduced Burnt & Faulty Meter Complaints by 10% p.a. for 3 years, saving ₹3 Crores
  • 5. Reduced Service Cable Consumption saving over 300 km or ₹1 Crore p.a.
  • 6. Simplified MMG work orders, reducing item codes from 92 to 30, and decreased vendors from 19 to 8
  • 7. Cleared over 60 process change notes from the CEO
  • 8. Fully Automated Material Reconciliation, Vendor Billing & QC processes
  • 9. Launched Happy Code SMS Service, achieving >99% Customer Satisfaction
  • 10. Introduced New Meter Seals to reduce losses
  • 11. Studied and implemented best practices from Gujarat and Mumbai Discoms
  • 12. Assisted in BSES hiring by conducting interviews
  • 13. Commenced Smart Meter Installations
  • 14. Participated in QCFI conventions, winning Gold & Par Excellence Awards
  • 15. Reused old materials, saving ₹1 Crore
  • 16. Conducted training for 600+ executives and vendor staff
  • (II) Profile: Circle Head (South) – Power Metering Group (PMG)
  • 1. Reduced the failure rate of 11 KV Metering Cubicles by 18% through preventive maintenance on 205 cubicles
  • 2. Contributed to loss reduction by gaining 1.5 MU (₹1.5 Crore) from cases referred to the Enforcement
  • 3. Saved ₹44 lakh by refurbishing and reusing old materials like LTCT boxes and metering cubicles
  • 4. Achieved Periodic meter testing of over 5000 cases annually in the South Circle
  • 5. Implemented 5S in office premises
LeadershipOperational EfficiencyEmployee TrainingProcess AutomationCost ReductionTechnology Implementation+10

Deputy General Manager

Apr 2014Mar 2017 · 2 yrs 11 mos · New Delhi, Delhi, India

  • Delivered 4 lakh Metering jobs Annually with a ₹100 Crore budget, achieving 99% Customer Satisfaction. Implemented Cost-Saving Measures, Automation, and Process Improvements.
  • Profile: Circle Head South – MMG
  • Responsibilities:
  • Metering Operations:
  • 1. Delivered over 4 lakh Metering jobs p.a. with an Annual Budget exceeding ₹100 Crores
  • 2. Achieved New Meter Installation within 1 day of DN, improving Customer Satisfaction from 80% to 99%
  • Customer Satisfaction & Automation:
  • 1. Developed Meter Installation Guidelines for Consumer Awareness
  • 2. Launched a Process for capturing Customer Satisfaction in MCR reports
  • 3. Implemented a 100% system (SAP)-based reconciliation process for critical MMG assets: Seals, MCR reports, and Lab Inspection Notices
  • 4. Introduced Color Coded Meter Sealing/Re-sealing Process, assigning responsibilities to respective departments
  • Process Improvements & Manpower Optimization:
  • 1. Implemented Vendor and MMG coordinator scorecards with awards for top performers and penalties for the bottom performers
  • 2. Redeployed over 150 sealing engineers to loss reduction initiatives, saving ₹5 Crores annually
  • 3. Introduced advanced theft-proof SARAL meters, addressing Theft, Space Constraints, and Cost Savings of ₹5 Crores
  • 4. Introduced a Dress Code for Meter Testers, enhancing company image and brand building
  • 5. Initiated in-house Meter Testing, saving ₹50 Lakhs annually
  • 6. Proposed design changes in Meter Accessories, saving ₹2 Crores annually
  • 7. Eliminated Polythene Bags in Meter Kits, reducing usage by 5 lakh bags annually and saving ₹15 Lakhs
  • 8. Trained over 450 Sealing Engineers and front-end personnel
  • 9. Utilized non-moving inventory items, saving ₹50 Lakhs
  • 10. Reduced the number of vendors from 27 to 19, improving control over manpower, material, and quality of work
  • 11. Recognized Best Performers monthly, boosting motivation across divisions
  • Achievements:
  • Awarded Excellent ratings twice in Appreciation of work from the company
Quality AssuranceBehavioral TrainingVendor ManagementDelivery OperationsOperations ManagementProcess Improvement+14

Senior Manager

Oct 2012Mar 2014 · 1 yr 5 mos · New Delhi, Delhi, India

  • Led MMG's Quality Management, cutting Installation deficiencies by 80%. Implemented ISO 9001:2015 compliance, trained 450+ staff, and Won Excellence Award.
  • Position: Quality & Process Management In-Charge – MMG
  • Responsibilities:
  • (I) Vision & Strategy Development:
  • 1. Defined the Vision for the MMG Department, setting strategic direction.
  • 2. Crafted SOPs for 7 Critical MMG processes: Device Issue & Return, Material Management, Quality Inspection, Transport Management, Vehicle Deployment, Vendor Billing, MCR Reconciliation, Seal Reconciliation, and Photo Uploading.
  • 3. Introduced and Implemented a Standard Vendor Billing process, achieving vendor bill clearance within 30 days.
  • 4. Established the Device Issue & Return process, facilitating the return of over 15,000 old meters to stores.
  • (II) Process Optimization & Quality Improvement:
  • 1. Introduced ISO 9001:2015 standards, documenting over 20 processes and departmental reports.
  • 2. Advocated for quality improvements in Meter installations, presenting to the CEO and securing 8 QC Engineers and 4 vehicles.
  • 3. Led a team of 8 QC Engineers, overseeing the inspection of over 40,000 meters and 19 vendors across South & West Delhi.
  • 4. Developed and implemented a Standard Quality Inspection Format for site inspections.
  • 5. Established clauses for quality checks, corrective actions by vendors, and a QC penalty system in vendor Work Orders.
  • 6. Reduced Meter Installation Deficiencies from over 90% to 10% through 8000+ quality checks and corrective actions within a year.
  • 7. Implemented Monthly Quality Check Reports, submitted to the CEO via HOD.
  • 8. Launched the Flying Squad QC concept with an onsite penalty system.
  • (III) Training & Development:
  • Trained over 150 Sealing Engineers and 300 front-end personnel on New Processes and Quality Standards.
  • (IV) Awards & Achievements:
  • Led the team to win the highest honor, the Excellence Award, at the QCFI National Convention in Kolkata and Gold Award in Delhi Chapter.
Employee TrainingStrategic PlanningQuality AssuranceBehavioral TrainingBillingBusiness Process Improvement+6

Reliance infrastructure

2 roles

Senior Manager

Promoted

Apr 2011Sep 2012 · 1 yr 5 mos · Noida, Uttar Pradesh, India

  • Engineering Coordination for packages valued at over ₹400 Crore for 4000 MW Tilaiya Ultra Mega Power Project. Facilitated technical evaluations, finalized design reports, and coordinated BOP packages with agencies.
  • Project: 6 x 660 (4000) MW Tilaiya Ultra Mega Power Project
  • Department: Engineering Coordination
  • Total Project Value: Over ₹400 Crore
  • Responsibilities:
  • 1. Coordinated engineering activities with consultants and vendors to ensure project alignment.
  • 2. Prepared and Reviewed Technical Evaluation Reports to assess project feasibility and compliance.
  • 3. Finalized Design Basis Reports (DBRs) and specifications to guide project implementation.
  • 4. Facilitated communication and follow-ups with various agencies for BOP Packages, including:
  • Ash Handling System valued at over ₹300 Crore
  • Fuel Oil Handling System valued at ₹80 Crore
  • EOT (Electric Overhead Traveling) Cranes valued at ₹50 Crore
Vendor CoordinationProject EngineeringTechnical ReviewsTechnical EvaluationDesign Basis ReportsEngineering Coordination

Deputy Manager

May 2006Mar 2011 · 4 yrs 10 mos · Noida, Uttar Pradesh, India

  • Project Management for 3 Power Projects (5,800 MW), valued at over ₹1800 Crore. Commended for driving efficiency and delivering projects ahead of schedule, demonstrating exceptional project management skills.
  • Project 1: 2 x 300 MW Deenbandhu Chhotu Ram Thermal Power Project, Yamunanagar, Haryana
  • Client: Haryana Power Generation Corporation Limited (HPGCL)
  • Department: Engineering Coordination
  • Total Project Value > ₹150 Crore
  • Responsibilities:
  • 1. Coordinated Engineering Activities with Consultants and Vendors.
  • 2. Prepared & Reviewed Technical Evaluation Reports.
  • 3. Finalized Design Basis Reports (DBRs) and Specifications.
  • 4. Followed up with various agencies for BOP Packages, including:
  • Ash Handling System valued at ₹100 Crore
  • Miscellaneous Cranes & Hoists @ ₹25 Crore
  • TG (Turbine Generator) EOT Crane @ ₹10 Crore
  • Workshop Equipment @ ₹20 Crore
  • Project 2: 2 x 600 MW Hisar Thermal Power Project, Hisar, Haryana
  • Client: Haryana Power Generation Corporation Limited (HPGCL)
  • Department: Project Management Group
  • Total Project Value > ₹1000 Crore
  • Responsibilities:
  • 1. Coordinated client activities with HPGCL at Chandigarh (Panchkula) for all BOP and BTG Packages.
  • 2. Spearheaded coordination efforts with HPGCL, ensuring timely clearance of Design Basis Reports (DBRs) and drawings for Mechanical, Electrical, IT, and Instrumentation packages.
  • Project 3: 6 x 660 (4000) MW Sasan Ultra Mega Power Project
  • Department: Project Management Group
  • Total Project Value > ₹700 Crore
  • Responsibilities:
  • 1. Coordinated with JSPL, Raigarh for the supply of PHB (Power House Building) Material, approximately 40,000 MT valued at >₹200 Crore
  • 2. Coordinated for Supply of BOP (Balance of Plant) Packages, including:
  • Ash Handling System: >₹300 Crore
  • Fuel Oil Handling System: ₹80 Crore
  • Compressed Air System: ₹30 Crore
  • Mill Reject System: ₹40 Crore
  • EOT (Electric Overhead Traveling) Cranes: ₹50 Crore
Service DeliveryClient CoordinationLogistical PlanningProject ManagementVendor CoordinationTechnical Reviews+2

Essar constructions (india) limited

Project Engineer

Aug 2005Apr 2006 · 8 mos · Jamnagar, Gujarat, India · On-site

  • Overseeing the production of approximately 7000 MT of structures for Crucial Refinery Units. Contributed to expanding Essar Oil Refinery's capacity from 7.5 MMTPA to 13.5 MMTPA as part of a pivotal expansion project.
  • Responsibilities:
  • 1. Project Planning: Developing and implementing fabrication plans to meet project timelines and requirements.
  • 2. Fabrication Management: Overseeing the Fabrication Process for Critical Refinery Units such as CDU/VDU, FCCU, Rail & Truck Loading Gantry, NSEW Pipe Racks, and Power Plant structures.
  • 3. Vendor Coordination: Liaising with vendors to ensure timely delivery of materials and adherence to quality standards during the fabrication process.
  • 4. Quality Assurance: Ensuring that fabricated structures meet design specifications and regulatory standards.
  • 5. Budget Management: Monitoring fabrication costs and expenses to ensure alignment with project budgets.
  • 6. Team Leadership: Providing guidance and direction to fabrication teams to ensure efficient and effective execution of tasks.
  • 7. Documentation: Maintaining accurate records of fabrication activities, including material receipts, inspections, and progress reports.
  • 8. Safety Compliance: Ensuring compliance with safety regulations and protocols during the fabrication process to maintain a safe working environment.
Quality AssuranceSafety ComplianceProject PlanningVendor CoordinationDocument ManagementFabrication+3

Hcc

2 roles

Mechanical Engineer

Jul 2004Jul 2005 · 1 yr · Rawatbhata, Rajasthan, India · On-site

  • Leading Contributions to World Record-Holding Nuclear Power Reactor Building No. 5:
  • 1. Responsible for Planning, Fabrication & Erection of following Critical Components of Reactor Building 5&6:
  • CV Liner
  • IC Dome Staging
  • MALB & EALB
  • 2. Planned and Erected 665 MT IC Dome Structure of Reactor Building 5 in a Semi-Assembled Stage from Ground to 120m height in just 8 parts, a first of its kind erection in India.
  • 3. Close Monitoring of Erection of Reactor Building Structures resulted in Reactor Building 5 achieving World Record for 2nd Longest Continuous Running Reactor globally, running for 765 Days.
  • 4. End-to-End Material Reconciliation of 2000 MT of Steel Structure on monthly basis with Scrap generation of less than 5%.
ErectionSteel StructuresMaterial ReconciliationProcess ImprovementPlanningService Operations+2

Engineering Trainee

Jul 2003Jul 2004 · 1 yr · Rawatbhata, Rajasthan, India · On-site

  • GET Excellence: Awarded 2 Special Certificates for Record Completion of Critical Structures in Nuclear Power Project
  • 1. Joined as Trainee Engineer for construction of 2x220MW Nuclear Power Reactor Buildings 5&6.
  • 2. Responsible for Planning, Fabrication & Erection of following Critical Components of Reactor Building 5&6:
  • CV Liner
  • IC Dome Staging
  • MALB & EALB
  • 3. Introduced Assembly Line Concept for Fabrication of over 660 MT Structure of IC Dome Staging.
  • 4. Awarded Appreciation certificate for Fabrication of IC Dome Staging Structure in record 3.5 months.
  • 5. Recognized with Appreciation certificate for Fabrication of CV Liner Structure in record 2.5 months.
Nuclear Power PlantsSteel StructuresProcess ImprovementPlanningFabrication

Associated engineers & allied products

Site Engineer

Jul 2002May 2003 · 10 mos · Rawatbhata, Rajasthan, India · On-site

  • 1. Coordinated fabrication of structural steel embedded parts for Reactor Building 3&4 at Rajasthan Atomic Power Projects (HCC).
  • 2. Managed day-to-day operations of contractual work, ensuring adherence to project timelines and quality standards.
Quality AssuranceManpower HandlingProject PlanningProject CoordinationFabrication

Education

The ICFAI University, Dehradun

(PG)DBM

Jan 2007Present

Vidyavardhaka College of Engineering

Jan 1998Jan 2002

Atomic Energy Central School

Jan 1986Jan 1997

Stackforce found 100+ more professionals with Operational Efficiency & Customer Relationship Management (crm)

Explore similar profiles based on matching skills and experience